X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0935033211000

Well Details

Well ID: 0935033211000
Loading map...
Location: 00/11-32-093-03W5/0
Location Alias: 00/11-32-93-03 W5M
Location Alias 2: 00/11-32-093-03 W5/00
Country: Canada
Province: Alberta
Township: 093
Meridian: 5
Range: 03
Section: 32
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED SENEX 11-32-93-3
Operator Name: Highwood Oil Company Ltd.
License Number: 0165803
License Date: 1994-03-10
License Status: Suspension
Spud Date: 1994-12-11
Final Drill Date: 1994-12-15
Well Total Depth: 1291.00 m
Surface Hole Latitude: 57.113380
Surface Hole Longitude: -114.445299

For data sources see[1][2]

Well History

Date Event
1994-03-10 Obtained License
1994-12-12 Surface Casing Operation Performed
1994-12-15 Finished Drilling
1994-12-15 Well Mode changed to Drilled and Cased
1994-12-16 Production Casing Operation Performed
1994-12-16 Rig Released
1995-01-03 Perforation Treatment Performed - Open-Hole Completion
1995-01-04 Liner Casing Operation Performed
1995-01-04 Perforation Treatment Performed - Cement Squeeze
1995-01-05 Well Log Performed
1995-01-06 Perforation Treatment Performed - Jet Perforation
1995-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-07 Well Log Performed
1995-01-09 Perforation Treatment Performed - Jet Perforation
1995-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-10 Well Log Performed
1995-01-16 Well Began Production
1995-01-16 Well Fluid changed to Crude Oil
1995-01-16 Well Mode changed to Flowing
1995-04-05 Well Fluid changed to Crude Oil
1995-04-05 Well Mode changed to Pumping
1999-01-22 Well Began Injection
1999-01-22 Well Fluid changed to Water
1999-01-22 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-01-03 Open Hole/Barefoot Completion 1255.00 1291.00 0
1995-01-04 Cement Squeeze 1255.00 1291.00 0
1995-01-06 Perforation 1259.00 1260.00 13
1995-01-06 Perforation 1261.50 1262.50 13
1995-01-07 Acid Treatment 1259.00 1262.50 0
1995-01-09 Perforation 1265.50 1267.50 13
1995-01-10 Acid Treatment 1259.00 1267.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1354 0.0 0.0 0.0
1996 1520 0.0 0.0 0.0
1997 1731 0.0 0.0 0.0
1998 160 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[5]

References