X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0935023615002

Well Details

Well ID: 0935023615002
Loading map...
Location: 00/15-36-093-02W5/2
Location Alias: 00/15-36-93-02 W5M
Location Alias 2: 00/15-36-093-02 W5/02
Country: Canada
Province: Alberta
Township: 093
Meridian: 5
Range: 02
Section: 36
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED SENEX 15-36-93-2
Operator Name: Highwood Oil Company Ltd.
License Number: 0210765
License Date: 1997-12-17
License Status: Suspension
Spud Date: 1997-12-29
Final Drill Date: 1998-02-16
Well Total Depth: 1286.40 m
Surface Hole Latitude: 57.115858
Surface Hole Longitude: -114.173530

For data sources see[1][2]

Well History

Date Event
1997-12-17 Obtained License
1998-01-01 Surface Casing Operation Performed
1998-01-03 Intermediate Casing Operation Performed
1998-01-11 Production Casing Operation Performed
1998-02-05 Well Log Performed
1998-02-14 Direction Drilling Operation Performed - Deviate
1998-02-16 Finished Drilling
1998-02-16 Perforation Treatment Performed - Open-Hole Completion
1998-02-16 Rig Released
1998-02-16 Well Mode changed to Drilled and Cased
1998-02-18 Well Log Performed
1998-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-02-27 Perforation Treatment Performed - Open-Hole Completion
1998-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-03-06 Perforation Treatment Performed - Open-Hole Completion
1998-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-03-14 Well Began Production
1998-03-14 Well Fluid changed to Crude Oil
1998-03-14 Well Mode changed to Pumping
1999-01-29 Perforation Treatment Performed - Cement Plug
1999-01-29 Plug Back Performed
1999-01-29 Well Fluid changed to Crude Oil
1999-01-29 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-02-14 1239.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-02-16 Open Hole/Barefoot Completion 1236.10 1278.00 0
1998-02-25 Acid Treatment 1236.10 1278.00 0
1998-02-27 Open Hole/Barefoot Completion 1236.10 1282.50 0
1998-03-01 Acid Treatment 1236.10 1282.50 0
1998-03-06 Open Hole/Barefoot Completion 1236.10 1286.40 0
1998-03-09 Acid Treatment 1236.10 1286.40 0
1999-01-29 Cement Plug 1225.00 1225.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 5070 0.0 0.0 0.0

For data sources see[6]

References