X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0925060614000

Well Details

Well ID: 0925060614000
Loading map...
Location: 00/14-06-092-06W5/0
Location Alias: 00/14-06-92-06 W5M
Location Alias 2: 00/14-06-092-06 W5/00
Country: Canada
Province: Alberta
Township: 092
Meridian: 5
Range: 06
Section: 06
County/Municipality: Municipal District of Opportunity No. 17
Well Name: SWORD KIDNEY 14-6-92-6
Operator Name: Crimson Oil & Gas Ltd.
License Number: 0231586
License Date: 2000-01-03
License Status: Abandoned
Spud Date: 2000-08-23
Final Drill Date: 2000-09-01
Well Total Depth: 1343.00 m
Surface Hole Latitude: 56.958209
Surface Hole Longitude: -114.956876

For data sources see[1][2]

Well History

Date Event
2000-01-03 Obtained License
2000-08-24 Well Log Performed
2000-08-25 Surface Casing Operation Performed
2000-08-26 Lost Circulation Occurred
2000-08-27 Direction Drilling Operation Performed - Deviate
2000-08-30 Intermediate Casing Operation Performed
2000-09-01 Finished Drilling
2000-09-02 Drill Stem Test Performed
2000-09-03 Liner Casing Operation Performed
2000-09-03 Rig Released
2000-09-03 Well Mode changed to Drilled and Cased
2000-09-20 Well Log Performed
2000-09-21 Perforation Treatment Performed - Jet Perforation
2000-09-21 Well Log Performed
2000-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-09-25 Perforation Treatment Performed - Jet Perforation
2000-09-25 Well Log Performed
2000-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-10-07 Well Began Production
2000-10-07 Well Fluid changed to Crude Oil
2000-10-07 Well Mode changed to Pumping
2007-08-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-08-29 Plug Back Performed
2007-08-29 Well Fluid changed to Crude Oil
2007-08-29 Well Mode changed to Abandoned Zone
2007-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-08-31 Plug Back Performed
2007-09-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-09-03 Plug Back Performed
2007-09-05 Perforation Treatment Performed - Bridge Plug No Cement Required
2007-09-15 Well Abandoned
2007-09-15 Well Fluid changed to Crude Oil
2007-09-15 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-08-27 938.80 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-09-21 Perforation 1296.70 1298.30 17
2000-09-22 Acid Treatment 1296.70 1298.30 0
2000-09-25 Perforation 1298.80 1303.00 17
2000-09-27 Acid Treatment 1298.80 1303.00 0
2007-08-29 Packing Device Capped w/Cement 1267.50 1286.00 0
2007-08-30 Packing Device Capped w/Cement 1193.00 1238.20 0
2007-08-31 Packing Device Capped w/Cement 390.00 403.00 0
2007-09-03 Packing Device Capped w/Cement 337.90 374.20 0
2007-09-05 Bridge Plug, No Cement 335.80 336.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 1958 0.0 0.0 0.0
2001 8435 0.0 0.0 0.0
2002 7512 0.0 0.0 0.0
2003 5831 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2000-08-26 Lost Circulation 418.00 418.00

For data sources see[7]

References