X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0925053614000

Well Details

Well ID: 0925053614000
Loading map...
Location: 00/14-36-092-05W5/0
Location Alias: 00/14-36-92-05 W5M
Location Alias 2: 00/14-36-092-05 W5/00
Country: Canada
Province: Alberta
Township: 092
Meridian: 5
Range: 05
Section: 36
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED SENEX 14-36-92-5
Operator Name: Highwood Oil Company Ltd.
License Number: 0127653
License Date: 1987-07-30
License Status: Issued
Spud Date: 1987-08-29
Final Drill Date: 1987-09-08
Well Total Depth: 1345.00 m
Surface Hole Latitude: 57.030106
Surface Hole Longitude: -114.659877

For data sources see[1][2]

Well History

Date Event
1987-07-30 Obtained License
1987-08-31 Surface Casing Operation Performed
1987-09-01 Lost Circulation Occurred
1987-09-03 Intermediate Casing Operation Performed
1987-09-08 Finished Drilling
1987-09-08 Well Log Performed
1987-09-08 Well Mode changed to Drilled and Cased
1987-09-09 Drill Stem Test Performed
1987-09-10 Drill Stem Test Performed
1987-09-11 Liner Casing Operation Performed
1987-09-11 Rig Released
1987-10-23 Well Log Performed
1987-10-24 Perforation Treatment Performed - Jet Perforation
1987-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-11-03 Well Began Production
1987-11-03 Well Fluid changed to Crude Oil
1987-11-03 Well Mode changed to Pumping
1989-02-15 Well Log Performed
1989-02-16 Perforation Treatment Performed - Jet Perforation
1989-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-02-19 Well Log Performed
1989-02-20 Perforation Treatment Performed - Jet Perforation
1989-02-20 Well Fluid changed to Crude Oil
1989-02-20 Well Mode changed to Pumping
1989-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-10-24 Perforation 1270.50 1271.50 13
1987-10-25 Acid Treatment 1270.50 1271.50 0
1989-02-16 Perforation 1262.50 1263.50 13
1989-02-16 Perforation 1266.00 1269.00 13
1989-02-17 Acid Treatment 1262.50 1271.50 0
1989-02-20 Perforation 1308.00 1314.00 13
1989-02-22 Acid Treatment 1308.00 1314.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 1385 0.0 0.0 0.0
1988 8315 0.0 0.0 0.0
1989 6900 0.0 0.0 0.0
1990 7723 0.0 0.0 0.0
1991 8265 0.0 0.0 0.0
1992 8369 0.0 0.0 0.0
1993 8283 0.0 0.0 0.0
1994 8572 0.0 0.0 0.0
1995 8430 0.0 0.0 0.0
1996 8632 0.0 0.0 0.0
1997 8392 0.0 0.0 0.0
1998 8586 0.0 0.0 0.0
1999 8635 0.0 0.0 0.0
2000 8537 0.0 0.0 0.0
2001 8564 0.0 0.0 0.0
2002 8230 0.0 0.0 0.0
2003 8551 0.0 0.0 0.0
2004 8099 0.0 0.0 0.0
2005 8361 0.0 0.0 0.0
2006 8575 0.0 0.0 0.0
2007 5573 0.0 0.0 0.0
2008 6952 0.0 0.0 0.0
2009 8499 0.0 0.0 0.0
2010 8583 0.0 0.0 0.0
2011 8318 0.0 0.0 0.0
2012 8678 0.0 0.0 0.0
2013 8487 0.0 0.0 0.0
2014 7738 0.0 0.0 0.0
2015 8488 0.0 0.0 0.0
2016 8706 0.0 0.0 0.0
2017 8630 0.0 0.0 0.0
2018 7917 0.0 0.0 0.0
2019 7001 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1987-09-01 Lost Circulation 467.00 618.00

For data sources see[6]

References