X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0915062602000

Well Details

Well ID: 0915062602000
Loading map...
Location: 00/02-26-091-06W5/0
Location Alias: 00/02-26-91-06 W5M
Location Alias 2: 00/02-26-091-06 W5/00
Country: Canada
Province: Alberta
Township: 091
Meridian: 5
Range: 06
Section: 26
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED KIDNEY 2-26-91-6
Operator Name: Highwood Oil Company Ltd.
License Number: 0131779
License Date: 1988-01-28
License Status: Abandoned
Spud Date: 1988-01-31
Final Drill Date: 1988-02-13
Well Total Depth: 1398.00 m
Surface Hole Latitude: 56.918395
Surface Hole Longitude: -114.844705

For data sources see[1][2]

Well History

Date Event
1988-01-28 Obtained License
1988-02-02 Surface Casing Operation Performed
1988-02-06 Intermediate Casing Operation Performed
1988-02-13 Finished Drilling
1988-02-13 Well Log Performed
1988-02-13 Well Mode changed to Drilled and Cased
1988-02-14 Drill Stem Test Performed
1988-02-15 Drill Stem Test Performed
1988-02-17 Liner Casing Operation Performed
1988-02-17 Rig Released
1988-02-18 Well Began Production
1988-02-18 Well Fluid changed to Crude Oil
1988-02-18 Well Mode changed to Flowing
1988-02-21 Well Log Performed
1988-02-23 Perforation Treatment Performed - Jet Perforation
1988-02-23 Well Log Performed
1988-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-27 Well Log Performed
1988-09-28 Perforation Treatment Performed - Jet Perforation
1988-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-05-20 Well Fluid changed to Crude Oil
1989-05-20 Well Mode changed to Pumping
1992-02-19 Perforation Treatment Performed - Jet Perforation
1992-10-11 Well Log Performed
1995-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-15 Plug Back Performed
2004-11-15 Well Fluid changed to Crude Oil
2004-11-15 Well Mode changed to Abandoned Zone
2004-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-16 Perforation Treatment Performed - Cement Plug
2004-12-06 Well Abandoned
2004-12-06 Well Fluid changed to Crude Oil
2004-12-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-02-23 Perforation 1375.00 1377.50 13
2004-11-16 Packing Device Capped w/Cement 864.00 879.00 0
2004-11-16 Cement Plug 849.00 864.00 0
2004-11-16 Packing Device Capped w/Cement 498.00 506.00 0
1988-02-24 Acid Treatment 1375.00 1377.50 0
1988-09-28 Perforation 1366.00 1368.00 13
1988-09-29 Acid Treatment 1366.00 1368.00 0
1992-02-19 Perforation 1363.00 1364.50 20
1992-02-19 Perforation 1359.50 1360.50 20
1992-02-19 Perforation 1354.00 1357.50 20
1995-12-19 Acid Treatment 1375.00 1377.50 0
2004-11-15 Packing Device Capped w/Cement 1334.00 1342.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 5320 0.0 0.0 0.0
1989 7240 0.0 0.0 0.0
1990 8278 0.0 0.0 0.0
1991 8270 0.0 0.0 0.0
1992 7742 0.0 0.0 0.0
1993 7703 0.0 0.0 0.0
1994 8214 0.0 0.0 0.0
1995 5941 0.0 0.0 0.0
1996 8698 0.0 0.0 0.0
1997 8368 0.0 0.0 0.0
1998 7072 0.0 0.0 0.0
1999 8667 0.0 0.0 0.0
2000 5509 0.0 0.0 0.0
2001 542 0.0 0.0 0.0

For data sources see[5]

References