If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0915062206000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.90503,"lon":-114.877486,"icon":""}]} |
Location: 00/06-22-091-06W5/0 | |
Location Alias: 00/06-22-91-06 W5M | |
Location Alias 2: 00/06-22-091-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 091 | |
Meridian: 5 | |
Range: 06 | |
Section: 22 | |
County/Municipality: Municipal District of Opportunity No. 17 | |
Well Name: PRED KIDNEY 6-22-91-6 | |
Operator Name: Highwood Oil Company Ltd. | |
License Number: 0130754 | |
License Date: 1987-12-21 | |
License Status: Abandoned | |
Spud Date: 1988-01-08 | |
Final Drill Date: 1988-01-20 | |
Well Total Depth: 1441.00 m | |
Surface Hole Latitude: 56.905030 | |
Surface Hole Longitude: -114.877486 |
Date | Event |
---|---|
1987-12-21 | Obtained License |
1988-01-11 | Surface Casing Operation Performed |
1988-01-12 | Lost Circulation Occurred |
1988-01-14 | Intermediate Casing Operation Performed |
1988-01-20 | Finished Drilling |
1988-01-20 | Well Log Performed |
1988-01-20 | Well Mode changed to Drilled and Cased |
1988-01-21 | Drill Stem Test Performed |
1988-01-22 | Production Casing Operation Performed |
1988-01-22 | Rig Released |
1988-02-05 | Well Log Performed |
1988-02-06 | Perforation Treatment Performed - Jet Perforation |
1988-02-06 | Well Log Performed |
1988-02-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-02-10 | Well Began Production |
1988-02-10 | Well Fluid changed to Crude Oil |
1988-02-10 | Well Mode changed to Pumping |
1993-03-04 | Perforation Treatment Performed - Jet Perforation |
1993-03-04 | Well Log Performed |
1998-01-02 | Well Log Performed |
1998-08-23 | Perforation Treatment Performed - Jet Perforation |
1998-08-23 | Well Log Performed |
1998-08-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2008-02-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-02-05 | Plug Back Performed |
2008-02-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-02-06 | Plug Back Performed |
2008-02-06 | Well Fluid changed to Crude Oil |
2008-02-06 | Well Log Performed |
2008-02-06 | Well Mode changed to Abandoned Zone |
2008-02-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-02-14 | Plug Back Performed |
2008-02-14 | Well Log Performed |
2008-02-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-02-21 | Plug Back Performed |
2008-02-24 | Well Abandoned |
2008-02-24 | Well Fluid changed to Crude Oil |
2008-02-24 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-02-06 | Perforation | 1404.00 | 1406.00 | 13 |
2008-02-14 | Packing Device Capped w/Cement | 672.00 | 680.00 | 0 |
2008-02-21 | Packing Device Capped w/Cement | 405.00 | 415.00 | 0 |
1988-02-07 | Acid Treatment | 1404.00 | 1406.00 | 0 |
1993-03-04 | Perforation | 1386.50 | 1388.80 | 13 |
1998-08-23 | Perforation | 1155.00 | 1172.00 | 13 |
1998-08-23 | Perforation | 1177.00 | 1183.00 | 13 |
1998-08-23 | Perforation | 1185.50 | 1188.00 | 13 |
1998-08-26 | Acid Treatment | 1155.00 | 1406.00 | 0 |
2008-02-05 | Packing Device Capped w/Cement | 1372.00 | 1380.00 | 0 |
2008-02-06 | Packing Device Capped w/Cement | 1137.00 | 1145.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 6243 | 0.0 | 0.0 | 0.0 |
1989 | 8032 | 0.0 | 0.0 | 0.0 |
1990 | 7462 | 0.0 | 0.0 | 0.0 |
1991 | 6939 | 0.0 | 0.0 | 0.0 |
1992 | 8455 | 0.0 | 0.0 | 0.0 |
1993 | 6821 | 0.0 | 0.0 | 0.0 |
1994 | 7655 | 0.0 | 0.0 | 0.0 |
1995 | 8719 | 0.0 | 0.0 | 0.0 |
1996 | 8520 | 0.0 | 0.0 | 0.0 |
1997 | 8490 | 0.0 | 0.0 | 0.0 |
1998 | 7212 | 0.0 | 0.0 | 0.0 |
2000 | 7919 | 0.0 | 0.0 | 0.0 |
2001 | 7478 | 0.0 | 0.0 | 0.0 |
2002 | 1186 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1988-01-12 | Lost Circulation | 535.00 | 535.00 |
For data sources see[6]