X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0915053302000

Well Details

Well ID: 0915053302000
Loading map...
Location: 00/02-33-091-05W5/0
Location Alias: 00/02-33-91-05 W5M
Location Alias 2: 00/02-33-091-05 W5/00
Country: Canada
Province: Alberta
Township: 091
Meridian: 5
Range: 05
Section: 33
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED KIDNEY 2-33-91-5
Operator Name: Highwood Oil Company Ltd.
License Number: 0156901
License Date: 1993-03-01
License Status: Abandoned
Spud Date: 1993-03-06
Final Drill Date: 1993-03-11
Well Total Depth: 1320.00 m
Surface Hole Latitude: 56.931351
Surface Hole Longitude: -114.735461

For data sources see[1][2]

Well History

Date Event
1993-03-01 Obtained License
1993-03-07 Surface Casing Operation Performed
1993-03-09 Lost Circulation Occurred
1993-03-11 Finished Drilling
1993-03-11 Well Mode changed to Drilled and Cased
1993-03-12 Production Casing Operation Performed
1993-03-12 Rig Released
1993-03-17 Perforation Treatment Performed - Open-Hole Completion
1993-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-03-19 Well Log Performed
1993-03-24 Well Began Production
1993-03-24 Well Fluid changed to Crude Oil
1993-03-24 Well Mode changed to Pumping
2006-04-30 Well Log Performed
2006-05-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-05-29 Plug Back Performed
2006-05-29 Well Fluid changed to Crude Oil
2006-05-29 Well Mode changed to Abandoned Zone
2006-05-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-06-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-06-02 Well Abandoned
2006-06-02 Well Fluid changed to Crude Oil
2006-06-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-03-17 Open Hole/Barefoot Completion 1307.80 1320.00 0
1993-03-18 Acid Treatment 1307.80 1320.00 0
2006-05-29 Packing Device Capped w/Cement 1287.00 1295.00 0
2006-05-30 Packing Device Capped w/Cement 800.00 808.00 0
2006-06-01 Packing Device Capped w/Cement 412.00 420.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 6144 0.0 0.0 0.0
1994 8294 0.0 0.0 0.0
1995 8085 0.0 0.0 0.0
1996 8692 0.0 0.0 0.0
1997 8612 0.0 0.0 0.0
1998 8700 0.0 0.0 0.0
1999 8727 0.0 0.0 0.0
2000 6814 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-03-09 Lost Circulation 442.00 1067.00

For data sources see[6]

References