X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0915052904000

Well Details

Well ID: 0915052904000
Loading map...
Location: 00/04-29-091-05W5/0
Location Alias: 00/04-29-91-05 W5M
Location Alias 2: 00/04-29-091-05 W5/00
Country: Canada
Province: Alberta
Township: 091
Meridian: 5
Range: 05
Section: 29
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED KIDNEY 4-29-91-5
Operator Name: Highwood Oil Company Ltd.
License Number: 0158865
License Date: 1993-06-07
License Status: Abandoned
Spud Date: 1993-06-10
Final Drill Date: 1993-06-16
Well Total Depth: 1382.00 m
Surface Hole Latitude: 56.916927
Surface Hole Longitude: -114.779417

For data sources see[1][2]

Well History

Date Event
1993-06-07 Obtained License
1993-06-12 Surface Casing Operation Performed
1993-06-15 Production Casing Operation Performed
1993-06-16 Finished Drilling
1993-06-16 Rig Released
1993-06-16 Well Log Performed
1993-06-16 Well Mode changed to Drilled and Cased
1993-06-19 Perforation Treatment Performed - Open-Hole Completion
1993-06-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-06-29 Well Began Production
1993-06-29 Well Fluid changed to Crude Oil
1993-06-29 Well Mode changed to Pumping
1994-03-21 Perforation Treatment Performed - Acid Wash - No Pressure
1994-11-17 Perforation Treatment Performed - Open-Hole Completion
1994-11-18 Well Log Performed
1994-11-19 Liner Casing Operation Performed
1994-11-19 Perforation Treatment Performed - Cement Squeeze
1994-11-19 Well Log Performed
1994-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-21 Perforation Treatment Performed - Jet Perforation
1994-11-22 Well Log Performed
1994-11-23 Perforation Treatment Performed - Jet Perforation
1994-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-24 Well Log Performed
1995-01-22 Perforation Treatment Performed - Cement Squeeze
1995-01-24 Perforation Treatment Performed - Cement Squeeze
1995-01-29 Perforation Treatment Performed - Jet Perforation
1995-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-30 Well Log Performed
1999-07-01 Well Fluid changed to Crude Oil
1999-07-01 Well Mode changed to Suspended
2008-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-06-10 Plug Back Performed
2008-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-06-13 Plug Back Performed
2008-06-13 Well Fluid changed to Crude Oil
2008-06-13 Well Mode changed to Abandoned Zone
2008-06-24 Well Abandoned
2008-06-24 Well Fluid changed to Crude Oil
2008-06-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-06-19 Open Hole/Barefoot Completion 1346.20 1355.90 0
1994-11-24 Acid Treatment 1352.00 1356.00 0
1995-01-22 Cement Squeeze 1355.00 1356.00 0
1995-01-24 Cement Squeeze 1352.00 1353.00 0
1995-01-29 Perforation 1371.50 1374.00 13
1995-01-30 Acid Treatment 1371.50 1374.00 0
2008-06-10 Packing Device Capped w/Cement 867.00 963.00 0
2008-06-13 Packing Device Capped w/Cement 443.00 458.00 0
1993-06-21 Acid Treatment 1346.20 1355.90 0
1994-03-21 Acid Wash 1346.20 1355.90 0
1994-11-17 Open Hole/Barefoot Completion 1346.20 1382.00 0
1994-11-19 Cement Squeeze 1346.20 1382.00 0
1994-11-21 Perforation 1371.50 1374.00 13
1994-11-21 Acid Treatment 1371.50 1374.00 0
1994-11-23 Perforation 1352.00 1353.00 13
1994-11-23 Perforation 1355.00 1356.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 4066 0.0 0.0 0.0
1994 8169 0.0 0.0 0.0
1995 2207 0.0 0.0 0.0
1996 116 0.0 0.0 0.0

For data sources see[5]

References