If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0915052904000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.916927,"lon":-114.779417,"icon":""}]} |
Location: 00/04-29-091-05W5/0 | |
Location Alias: 00/04-29-91-05 W5M | |
Location Alias 2: 00/04-29-091-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 091 | |
Meridian: 5 | |
Range: 05 | |
Section: 29 | |
County/Municipality: Municipal District of Opportunity No. 17 | |
Well Name: PRED KIDNEY 4-29-91-5 | |
Operator Name: Highwood Oil Company Ltd. | |
License Number: 0158865 | |
License Date: 1993-06-07 | |
License Status: Abandoned | |
Spud Date: 1993-06-10 | |
Final Drill Date: 1993-06-16 | |
Well Total Depth: 1382.00 m | |
Surface Hole Latitude: 56.916927 | |
Surface Hole Longitude: -114.779417 |
Date | Event |
---|---|
1993-06-07 | Obtained License |
1993-06-12 | Surface Casing Operation Performed |
1993-06-15 | Production Casing Operation Performed |
1993-06-16 | Finished Drilling |
1993-06-16 | Rig Released |
1993-06-16 | Well Log Performed |
1993-06-16 | Well Mode changed to Drilled and Cased |
1993-06-19 | Perforation Treatment Performed - Open-Hole Completion |
1993-06-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-06-29 | Well Began Production |
1993-06-29 | Well Fluid changed to Crude Oil |
1993-06-29 | Well Mode changed to Pumping |
1994-03-21 | Perforation Treatment Performed - Acid Wash - No Pressure |
1994-11-17 | Perforation Treatment Performed - Open-Hole Completion |
1994-11-18 | Well Log Performed |
1994-11-19 | Liner Casing Operation Performed |
1994-11-19 | Perforation Treatment Performed - Cement Squeeze |
1994-11-19 | Well Log Performed |
1994-11-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-11-21 | Perforation Treatment Performed - Jet Perforation |
1994-11-22 | Well Log Performed |
1994-11-23 | Perforation Treatment Performed - Jet Perforation |
1994-11-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-11-24 | Well Log Performed |
1995-01-22 | Perforation Treatment Performed - Cement Squeeze |
1995-01-24 | Perforation Treatment Performed - Cement Squeeze |
1995-01-29 | Perforation Treatment Performed - Jet Perforation |
1995-01-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-01-30 | Well Log Performed |
1999-07-01 | Well Fluid changed to Crude Oil |
1999-07-01 | Well Mode changed to Suspended |
2008-06-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-06-10 | Plug Back Performed |
2008-06-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-06-13 | Plug Back Performed |
2008-06-13 | Well Fluid changed to Crude Oil |
2008-06-13 | Well Mode changed to Abandoned Zone |
2008-06-24 | Well Abandoned |
2008-06-24 | Well Fluid changed to Crude Oil |
2008-06-24 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1993-06-19 | Open Hole/Barefoot Completion | 1346.20 | 1355.90 | 0 |
1994-11-24 | Acid Treatment | 1352.00 | 1356.00 | 0 |
1995-01-22 | Cement Squeeze | 1355.00 | 1356.00 | 0 |
1995-01-24 | Cement Squeeze | 1352.00 | 1353.00 | 0 |
1995-01-29 | Perforation | 1371.50 | 1374.00 | 13 |
1995-01-30 | Acid Treatment | 1371.50 | 1374.00 | 0 |
2008-06-10 | Packing Device Capped w/Cement | 867.00 | 963.00 | 0 |
2008-06-13 | Packing Device Capped w/Cement | 443.00 | 458.00 | 0 |
1993-06-21 | Acid Treatment | 1346.20 | 1355.90 | 0 |
1994-03-21 | Acid Wash | 1346.20 | 1355.90 | 0 |
1994-11-17 | Open Hole/Barefoot Completion | 1346.20 | 1382.00 | 0 |
1994-11-19 | Cement Squeeze | 1346.20 | 1382.00 | 0 |
1994-11-21 | Perforation | 1371.50 | 1374.00 | 13 |
1994-11-21 | Acid Treatment | 1371.50 | 1374.00 | 0 |
1994-11-23 | Perforation | 1352.00 | 1353.00 | 13 |
1994-11-23 | Perforation | 1355.00 | 1356.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1993 | 4066 | 0.0 | 0.0 | 0.0 |
1994 | 8169 | 0.0 | 0.0 | 0.0 |
1995 | 2207 | 0.0 | 0.0 | 0.0 |
1996 | 116 | 0.0 | 0.0 | 0.0 |
For data sources see[5]