X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0915052204020

Well Details

Well ID: 0915052204020
Loading map...
Location: 02/04-22-091-05W5/0
Location Alias: 02/04-22-91-05 W5M
Location Alias 2: 02/04-22-091-05 W5/00
Country: Canada
Province: Alberta
Township: 091
Meridian: 5
Range: 05
Section: 22
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED KIDNEY 4-22-91-5
Operator Name: Highwood Oil Company Ltd.
License Number: 0166519
License Date: 1994-04-20
License Status: Abandoned
Spud Date: 1994-04-29
Final Drill Date: 1994-05-05
Well Total Depth: 1330.00 m
Surface Hole Latitude: 56.902195
Surface Hole Longitude: -114.724469

For data sources see[1][2]

Well History

Date Event
1994-04-20 Obtained License
1994-05-01 Surface Casing Operation Performed
1994-05-05 Finished Drilling
1994-05-05 Production Casing Operation Performed
1994-05-05 Rig Released
1994-05-05 Well Mode changed to Drilled and Cased
1994-05-08 Perforation Treatment Performed - Open-Hole Completion
1994-05-08 Well Log Performed
1994-05-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-15 Well Began Production
1994-05-15 Well Fluid changed to Crude Oil
1994-05-15 Well Mode changed to Pumping
1994-07-16 Perforation Treatment Performed - Cement Plug
1994-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-07-17 Perforation Treatment Performed - Open-Hole Completion
1999-10-01 Well Fluid changed to Crude Oil
1999-10-01 Well Mode changed to Suspended
2000-12-06 Well Log Performed
2000-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-01 Well Fluid changed to Crude Oil
2001-05-01 Well Mode changed to Pumping
2002-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-04 Plug Back Performed
2002-03-04 Well Fluid changed to Crude Oil
2002-03-04 Well Mode changed to Abandoned Zone
2002-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-05 Plug Back Performed
2002-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-06 Plug Back Performed
2002-03-07 Well Abandoned
2002-03-07 Well Fluid changed to Crude Oil
2002-03-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-05-08 Open Hole/Barefoot Completion 1319.70 1330.00 0
2002-03-06 Packing Device Capped w/Cement 411.20 419.20 0
1994-05-10 Acid Treatment 1319.70 1330.00 0
1994-05-12 Acid Treatment 1319.70 1328.00 0
1994-07-16 Cement Plug 1326.00 1328.20 0
1994-07-17 Open Hole/Barefoot Completion 1319.70 1326.00 0
1994-07-17 Acid Treatment 1324.00 1326.00 0
2000-12-09 Acid Treatment 1319.70 1328.00 0
2002-03-04 Packing Device Capped w/Cement 1306.10 1314.10 0
2002-03-05 Packing Device Capped w/Cement 823.50 831.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 5400 0.0 0.0 0.0
1995 8622 0.0 0.0 0.0
1996 8515 0.0 0.0 0.0
1997 8329 0.0 0.0 0.0
1998 5709 0.0 0.0 0.0
2001 2888 0.0 0.0 0.0

For data sources see[5]

References