X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0915052002000

Well Details

Well ID: 0915052002000
Loading map...
Location: 00/02-20-091-05W5/0
Location Alias: 00/02-20-91-05 W5M
Location Alias 2: 00/02-20-091-05 W5/00
Country: Canada
Province: Alberta
Township: 091
Meridian: 5
Range: 05
Section: 20
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED KIDNEY 2-20-91-5
Operator Name: Highwood Oil Company Ltd.
License Number: 0172861
License Date: 1994-11-23
License Status: Abandoned
Spud Date: 1994-12-01
Final Drill Date: 1994-12-06
Well Total Depth: 1391.00 m
Surface Hole Latitude: 56.903251
Surface Hole Longitude: -114.764049

For data sources see[1][2]

Well History

Date Event
1994-11-23 Obtained License
1994-12-03 Surface Casing Operation Performed
1994-12-06 Finished Drilling
1994-12-06 Well Mode changed to Drilled and Cased
1994-12-08 Production Casing Operation Performed
1994-12-08 Rig Released
1994-12-17 Perforation Treatment Performed - Open-Hole Completion
1994-12-17 Well Log Performed
1994-12-18 Well Log Performed
1994-12-19 Liner Casing Operation Performed
1994-12-19 Perforation Treatment Performed - Cement Squeeze
1994-12-20 Perforation Treatment Performed - Jet Perforation
1994-12-20 Well Log Performed
1994-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-03 Well Began Production
1995-01-03 Well Fluid changed to Crude Oil
1995-01-03 Well Mode changed to Flowing
1996-01-15 Well Fluid changed to Crude Oil
1996-01-15 Well Mode changed to Pumping
2001-02-08 Perforation Treatment Performed - Jet Perforation
2001-02-08 Well Log Performed
2001-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-03-31 Well Fluid changed to Crude Oil
2003-03-31 Well Mode changed to Suspended
2005-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-02-11 Plug Back Performed
2005-02-11 Well Fluid changed to Crude Oil
2005-02-11 Well Mode changed to Abandoned Zone
2005-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-02-12 Perforation Treatment Performed - Cement Plug
2005-02-12 Well Log Performed
2005-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-02-14 Well Log Performed
2005-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-02-20 Well Abandoned
2005-02-20 Well Fluid changed to Crude Oil
2005-02-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-12-17 Open Hole/Barefoot Completion 1359.00 1391.00 0
2005-02-12 Cement Plug 1244.00 1261.00 0
2005-02-13 Packing Device Capped w/Cement 892.00 900.00 0
2005-02-13 Packing Device Capped w/Cement 464.00 472.00 0
2005-02-16 Packing Device Capped w/Cement 441.00 449.00 0
1994-12-19 Cement Squeeze 1359.00 1391.00 0
1994-12-20 Perforation 1364.00 1365.00 13
1994-12-20 Perforation 1366.00 1367.00 13
1994-12-21 Acid Treatment 1364.00 1367.00 0
2001-02-08 Perforation 1369.00 1370.00 20
2001-02-09 Acid Treatment 1369.00 1370.00 0
2005-02-11 Packing Device Capped w/Cement 1350.00 1358.00 0
2005-02-12 Packing Device Capped w/Cement 1261.00 1276.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 7618 0.0 0.0 0.0
1996 7975 0.0 0.0 0.0
1997 8363 0.0 0.0 0.0
1998 8490 0.0 0.0 0.0
1999 8476 0.0 0.0 0.0
2000 8666 0.0 0.0 0.0
2001 8093 0.0 0.0 0.0
2002 1488 0.0 0.0 0.0

For data sources see[5]

References