X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0915051711000

Well Details

Well ID: 0915051711000
Loading map...
Location: 00/11-17-091-05W5/0
Location Alias: 00/11-17-91-05 W5M
Location Alias 2: 00/11-17-091-05 W5/00
Country: Canada
Province: Alberta
Township: 091
Meridian: 5
Range: 05
Section: 17
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED KIDNEY 11-17-91-5
Operator Name: Highwood Oil Company Ltd.
License Number: 0157008
License Date: 1993-03-04
License Status: Abandoned
Spud Date: 1993-03-10
Final Drill Date: 1993-03-17
Well Total Depth: 1389.80 m
Surface Hole Latitude: 56.894659
Surface Hole Longitude: -114.770569

For data sources see[1][2]

Well History

Date Event
1993-03-04 Obtained License
1993-03-12 Surface Casing Operation Performed
1993-03-16 Production Casing Operation Performed
1993-03-17 Finished Drilling
1993-03-17 Perforation Treatment Performed - Open-Hole Completion
1993-03-17 Rig Released
1993-03-17 Well Mode changed to Drilled and Cased
1993-03-18 Perforation Treatment Performed - Acid Wash - No Pressure
1993-03-18 Well Log Performed
1993-03-23 Well Began Production
1993-03-23 Well Fluid changed to Crude Oil
1993-03-23 Well Mode changed to Pumping
1994-07-06 Perforation Treatment Performed - Cement Plug
1994-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-31 Well Fluid changed to Crude Oil
1995-10-31 Well Mode changed to Suspended
1996-04-08 Well Fluid changed to Crude Oil
1996-04-08 Well Mode changed to Pumping
2005-02-22 Perforation Treatment Performed - Abrasa-Jet Perforation
2005-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-02-22 Perforation Treatment Performed - Cement Squeeze
2005-02-22 Plug Back Performed
2005-02-22 Well Fluid changed to Crude Oil
2005-02-22 Well Mode changed to Abandoned Zone
2005-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-03-03 Plug Back Performed
2005-03-05 Well Abandoned
2005-03-05 Well Fluid changed to Crude Oil
2005-03-05 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-03-17 Open Hole/Barefoot Completion 1372.00 1389.80 0
1993-03-18 Acid Wash 1372.00 1389.80 0
1994-07-06 Cement Plug 1387.00 1389.80 0
1994-07-08 Acid Treatment 1372.00 1387.00 0
2005-02-22 Packing Device Capped w/Cement 1354.00 1362.00 0
2005-02-22 Hydra Jet Perforation 858.00 859.00 1
2005-02-22 Cement Squeeze 858.00 859.00 0
2005-03-03 Packing Device Capped w/Cement 463.00 464.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 5976 0.0 0.0 0.0
1994 7140 0.0 0.0 0.0
1995 1274 0.0 0.0 0.0
1996 5288 0.0 0.0 0.0
1997 6503 0.0 0.0 0.0
1998 6275 0.0 0.0 0.0
1999 8634 0.0 0.0 0.0
2000 8759 0.0 0.0 0.0
2001 1807 0.0 0.0 0.0

For data sources see[5]

References