X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0915051609000

Well Details

Well ID: 0915051609000
Loading map...
Location: 00/09-16-091-05W5/0
Location Alias: 00/09-16-91-05 W5M
Location Alias 2: 00/09-16-091-05 W5/00
Country: Canada
Province: Alberta
Township: 091
Meridian: 5
Range: 05
Section: 16
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED KIDNEY 9-16-91-5
Operator Name: Highwood Oil Company Ltd.
License Number: 0166369
License Date: 1994-04-11
License Status: Abandoned
Spud Date: 1994-04-13
Final Drill Date: 1994-04-18
Well Total Depth: 1376.50 m
Surface Hole Latitude: 56.895980
Surface Hole Longitude: -114.732326

For data sources see[1][2]

Well History

Date Event
1994-04-11 Obtained License
1994-04-14 Surface Casing Operation Performed
1994-04-18 Finished Drilling
1994-04-18 Well Mode changed to Drilled and Cased
1994-04-19 Production Casing Operation Performed
1994-04-19 Rig Released
1994-04-23 Perforation Treatment Performed - Open-Hole Completion
1994-04-23 Well Log Performed
1994-04-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-28 Well Began Production
1994-04-28 Well Fluid changed to Crude Oil
1994-04-28 Well Mode changed to Pumping
1995-01-01 Well Fluid changed to Crude Oil
1995-01-01 Well Mode changed to Suspended
2004-10-18 Well Log Performed
2004-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-10-19 Plug Back Performed
2004-10-19 Well Fluid changed to Crude Oil
2004-10-19 Well Mode changed to Abandoned Zone
2004-10-21 Well Log Performed
2004-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-09 Well Abandoned
2004-11-09 Well Fluid changed to Crude Oil
2004-11-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-04-23 Open Hole/Barefoot Completion 1371.00 1376.50 0
1994-04-25 Acid Treatment 1371.00 1376.50 0
2004-10-19 Packing Device Capped w/Cement 496.00 504.00 0
2004-10-22 Packing Device Capped w/Cement 442.00 450.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 227 0.0 0.0 0.0

For data sources see[5]

References