X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0915051013000

Well Details

Well ID: 0915051013000
Loading map...
Location: 00/13-10-091-05W5/0
Location Alias: 00/13-10-91-05 W5M
Location Alias 2: 00/13-10-091-05 W5/00
Country: Canada
Province: Alberta
Township: 091
Meridian: 5
Range: 05
Section: 10
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED KIDNEY 13-10-91-5
Operator Name: Highwood Oil Company Ltd.
License Number: 0166198
License Date: 1994-03-30
License Status: Suspension
Spud Date: 1994-04-02
Final Drill Date: 1994-04-08
Well Total Depth: 1416.00 m
Surface Hole Latitude: 56.885464
Surface Hole Longitude: -114.725959

For data sources see[1][2]

Well History

Date Event
1994-03-30 Obtained License
1994-04-04 Surface Casing Operation Performed
1994-04-05 Lost Circulation Occurred
1994-04-08 Finished Drilling
1994-04-08 Production Casing Operation Performed
1994-04-08 Well Mode changed to Drilled and Cased
1994-04-09 Rig Released
1994-04-15 Well Log Performed
1994-04-17 Perforation Treatment Performed - Open-Hole Completion
1994-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-23 Well Began Production
1994-04-23 Well Fluid changed to Crude Oil
1994-04-23 Well Mode changed to Pumping
1994-04-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-08-03 Perforation Treatment Performed - Open-Hole Completion
1994-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-11-01 Well Fluid changed to Crude Oil
2004-11-01 Well Mode changed to Suspended
2017-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-02-28 Plug Back Performed
2017-02-28 Well Fluid changed to Crude Oil
2017-02-28 Well Mode changed to Abandoned Zone
2017-03-02 Perforation Treatment Performed - Jet Perforation
2017-03-11 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-04-17 Open Hole/Barefoot Completion 1404.00 1413.00 0
1994-04-18 Acid Treatment 1404.00 1412.00 0
1994-04-26 Acid Treatment 1404.00 1413.00 0
1994-08-03 Open Hole/Barefoot Completion 1404.00 1416.00 0
1994-08-04 Acid Treatment 1408.00 1412.00 0
1996-05-05 Acid Treatment 1404.00 1416.00 0
2017-02-28 Packing Device Capped w/Cement 1390.00 1398.00 0
2017-03-02 Perforation 495.50 496.50 10
2017-03-11 Cement Squeeze 495.50 496.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 4570 0.0 0.0 0.0
1995 8133 0.0 0.0 0.0
1996 7834 0.0 0.0 0.0
1997 8150 0.0 0.0 0.0
1998 8743 0.0 0.0 0.0
1999 8484 0.0 0.0 0.0
2000 8693 0.0 0.0 0.0
2001 8717 0.0 0.0 0.0
2002 8735 0.0 0.0 0.0
2003 8515 0.0 0.0 0.0
2004 7205 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-04-05 Lost Circulation 541.00 626.00
2017-03-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References