X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0915050902000

Well Details

Well ID: 0915050902000
Loading map...
Location: 00/02-09-091-05W5/0
Location Alias: 00/02-09-91-05 W5M
Location Alias 2: 00/02-09-091-05 W5/00
Country: Canada
Province: Alberta
Township: 091
Meridian: 5
Range: 05
Section: 09
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED KIDNEY 2-9-91-5
Operator Name: Highwood Oil Company Ltd.
License Number: 0123633
License Date: 1986-08-14
License Status: Abandoned
Spud Date: 1986-08-22
Final Drill Date: 1986-09-06
Well Total Depth: 1451.00 m
Surface Hole Latitude: 56.874929
Surface Hole Longitude: -114.737625

For data sources see[1][2]

Well History

Date Event
1986-08-14 Obtained License
1986-08-24 Surface Casing Operation Performed
1986-09-01 Intermediate Casing Operation Performed
1986-09-06 Finished Drilling
1986-09-06 Well Mode changed to Drilled and Cased
1986-09-07 Well Log Performed
1986-09-08 Drill Stem Test Performed
1986-09-08 Well Log Performed
1986-09-09 Production Casing Operation Performed
1986-09-10 Rig Released
1986-09-23 Perforation Treatment Performed - Jet Perforation
1986-09-23 Well Log Performed
1986-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-10-01 Well Began Production
1986-10-01 Well Fluid changed to Crude Oil
1986-10-01 Well Mode changed to Flowing
1989-05-17 Well Fluid changed to Crude Oil
1989-05-17 Well Mode changed to Pumping
2004-09-16 Well Log Performed
2004-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-09-18 Plug Back Performed
2004-09-18 Well Fluid changed to Crude Oil
2004-09-18 Well Mode changed to Abandoned Zone
2004-09-27 Well Abandoned
2004-09-27 Well Fluid changed to Crude Oil
2004-09-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-09-23 Perforation 1417.00 1419.00 13
1986-09-24 Acid Treatment 1417.00 1419.00 0
2004-09-18 Packing Device Capped w/Cement 577.00 587.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 1281 0.0 0.0 0.0
1987 5887 0.0 0.0 0.0
1988 5761 0.0 0.0 0.0
1989 6600 0.0 0.0 0.0
1990 6425 0.0 0.0 0.0
1991 6856 0.0 0.0 0.0
1992 5733 0.0 0.0 0.0
1993 8473 0.0 0.0 0.0
1994 8575 0.0 0.0 0.0
1995 8410 0.0 0.0 0.0
1996 8647 0.0 0.0 0.0
1997 8552 0.0 0.0 0.0
1998 8345 0.0 0.0 0.0
1999 8303 0.0 0.0 0.0
2000 7667 0.0 0.0 0.0
2001 8330 0.0 0.0 0.0
2002 7175 0.0 0.0 0.0

For data sources see[5]

References