X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0906050508000

Well Details

Well ID: 0906050508000
Loading map...
Location: 00/08-05-090-05W6/0
Location Alias: 00/08-05-90-05 W6M
Location Alias 2: 00/08-05-090-05 W6/00
Country: Canada
Province: Alberta
Township: 090
Meridian: 6
Range: 05
Section: 05
County/Municipality: Clear Hills County
Well Name: SYDCO CHARLIE 8-5-90-5
Operator Name: Sydco Energy Inc.
License Number: 0426232
License Date: 2010-11-24
License Status: Suspension
Spud Date: 2010-12-12
Final Drill Date: 2011-01-10
Well Total Depth: 2147.00 m
Surface Hole Latitude: 56.773593
Surface Hole Longitude: -118.765949

For data sources see[1][2]

Well History

Date Event
2010-11-24 Obtained License
2010-12-13 Surface Casing Operation Performed
2010-12-16 Direction Drilling Operation Performed - Horizontal
2010-12-18 Intermediate Casing Operation Performed
2011-01-09 Liner Casing Operation Performed
2011-01-10 Finished Drilling
2011-01-10 Rig Released
2011-01-10 Well Mode changed to Drilled and Cased
2011-01-11 Perforation Treatment Performed - Open-Hole Completion
2011-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-31 Well Log Performed
2011-02-08 Well Began Production
2011-02-08 Well Fluid changed to Crude Oil
2011-02-08 Well Mode changed to Pumping
2015-01-01 Well Fluid changed to Crude Oil
2015-01-01 Well Mode changed to Suspended
2020-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-30 Plug Back Performed
2020-01-30 Well Fluid changed to Crude Oil
2020-01-30 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-12-16 936.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-11 Open Hole/Barefoot Completion 1300.00 2141.00 0
2020-01-30 Packing Device Capped w/Cement 1173.00 1193.00 0
2011-01-24 Multi-Stage Fracture 2092.30 2092.40 0
2011-01-24 Multi-Stage Fracture 1894.50 1894.60 0
2011-01-24 Multi-Stage Fracture 1883.80 1883.90 0
2011-01-24 Multi-Stage Fracture 1769.70 1769.80 0
2011-01-24 Multi-Stage Fracture 1669.00 1669.10 0
2011-01-24 Multi-Stage Fracture 1568.20 1568.30 0
2011-01-24 Multi-Stage Fracture 1454.10 1454.20 0
2011-01-24 Multi-Stage Fracture 1353.50 1353.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1055 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-30 No Incident Encountered 0.00 0.00

For data sources see[7]

References