X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0905052202000

Well Details

Well ID: 0905052202000
Loading map...
Location: 00/02-22-090-05W5/0
Location Alias: 00/02-22-90-05 W5M
Location Alias 2: 00/02-22-090-05 W5/00
Country: Canada
Province: Alberta
Township: 090
Meridian: 5
Range: 05
Section: 22
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED KIDNEY 2-22-90-5
Operator Name: Highwood Oil Company Ltd.
License Number: 0165194
License Date: 1994-02-16
License Status: Abandoned
Spud Date: 1994-03-22
Final Drill Date: 1994-03-28
Well Total Depth: 1469.00 m
Surface Hole Latitude: 56.816139
Surface Hole Longitude: -114.703427

For data sources see[1][2]

Well History

Date Event
1994-02-16 Obtained License
1994-03-24 Surface Casing Operation Performed
1994-03-25 Lost Circulation Occurred
1994-03-28 Finished Drilling
1994-03-28 Well Mode changed to Drilled and Cased
1994-03-29 Production Casing Operation Performed
1994-03-29 Rig Released
1994-04-03 Perforation Treatment Performed - Open-Hole Completion
1994-04-04 Well Log Performed
1994-04-07 Well Began Production
1994-04-07 Well Fluid changed to Crude Oil
1994-04-07 Well Mode changed to Pumping
2000-09-01 Well Fluid changed to Crude Oil
2000-09-01 Well Mode changed to Suspended
2005-06-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-07 Plug Back Performed
2005-06-07 Well Fluid changed to Crude Oil
2005-06-07 Well Mode changed to Abandoned Zone
2005-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-20 Well Abandoned
2005-06-20 Well Fluid changed to Crude Oil
2005-06-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-04-03 Open Hole/Barefoot Completion 1462.00 1469.00 0
2005-06-07 Packing Device Capped w/Cement 1441.00 1449.00 0
2005-06-08 Packing Device Capped w/Cement 704.00 712.00 0
2005-06-20 Packing Device Capped w/Cement 600.00 608.00 0
2005-06-20 Packing Device Capped w/Cement 27.00 35.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 6300 0.0 0.0 0.0
1995 8413 0.0 0.0 0.0
1996 5973 0.0 0.0 0.0
1997 7937 0.0 0.0 0.0
1998 8722 0.0 0.0 0.0
1999 8635 0.0 0.0 0.0
2000 5704 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-03-25 Lost Circulation 625.00 731.00

For data sources see[6]

References