X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0905051609000

Well Details

Well ID: 0905051609000
Loading map...
Location: 00/09-16-090-05W5/0
Location Alias: 00/09-16-90-05 W5M
Location Alias 2: 00/09-16-090-05 W5/00
Country: Canada
Province: Alberta
Township: 090
Meridian: 5
Range: 05
Section: 16
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED KIDNEY 9-16-90-5
Operator Name: Highwood Oil Company Ltd.
License Number: 0199061
License Date: 1997-03-07
License Status: Suspension
Spud Date: 1997-03-17
Final Drill Date: 1997-03-28
Well Total Depth: 1565.00 m
Surface Hole Latitude: 56.809852
Surface Hole Longitude: -114.719747

For data sources see[1][2]

Well History

Date Event
1997-03-07 Obtained License
1997-03-19 Surface Casing Operation Performed
1997-03-20 Direction Drilling Operation Performed - Deviate
1997-03-20 Lost Circulation Occurred
1997-03-27 Intermediate Casing Operation Performed
1997-03-28 Finished Drilling
1997-03-28 Well Log Performed
1997-03-28 Well Mode changed to Drilled and Cased
1997-03-29 Production Casing Operation Performed
1997-03-29 Rig Released
1997-04-03 Perforation Treatment Performed - Jet Perforation
1997-04-03 Well Log Performed
1997-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-07 Perforation Treatment Performed - Jet Perforation
1997-04-07 Well Log Performed
1997-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-26 Well Began Production
1997-04-26 Well Fluid changed to Crude Oil
1997-04-26 Well Mode changed to Pumping
2010-08-01 Well Fluid changed to Crude Oil
2010-08-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-03-20 710.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-04-03 Perforation 1528.50 1533.00 13
1997-04-05 Acid Treatment 1528.50 1533.00 0
1997-04-07 Perforation 1528.50 1533.00 13
1997-04-08 Acid Treatment 1528.50 1533.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 5223 0.0 0.0 0.0
1998 8202 0.0 0.0 0.0
1999 8504 0.0 0.0 0.0
2000 8721 0.0 0.0 0.0
2001 8728 0.0 0.0 0.0
2002 8139 0.0 0.0 0.0
2003 8749 0.0 0.0 0.0
2004 8551 0.0 0.0 0.0
2005 8063 0.0 0.0 0.0
2006 8692 0.0 0.0 0.0
2007 8674 0.0 0.0 0.0
2008 8735 0.0 0.0 0.0
2009 4267 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1997-03-20 Lost Circulation 634.00 758.00

For data sources see[7]

References