X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0905051513000

Well Details

Well ID: 0905051513000
Loading map...
Location: 00/13-15-090-05W5/0
Location Alias: 00/13-15-90-05 W5M
Location Alias 2: 00/13-15-090-05 W5/00
Country: Canada
Province: Alberta
Township: 090
Meridian: 5
Range: 05
Section: 15
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED KIDNEY 13-15-90-5
Operator Name: Highwood Oil Company Ltd.
License Number: 0169810
License Date: 1994-08-23
License Status: Abandoned
Spud Date: 1994-08-25
Final Drill Date: 1994-09-02
Well Total Depth: 1504.00 m
Surface Hole Latitude: 56.811326
Surface Hole Longitude: -114.717563

For data sources see[1][2]

Well History

Date Event
1994-08-23 Obtained License
1994-08-28 Surface Casing Operation Performed
1994-09-02 Finished Drilling
1994-09-02 Intermediate Casing Operation Performed
1994-09-02 Perforation Treatment Performed - Open-Hole Completion
1994-09-02 Well Log Performed
1994-09-02 Well Mode changed to Drilled and Cased
1994-09-03 Rig Released
1994-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-12 Perforation Treatment Performed - Open-Hole Completion
1994-09-13 Well Log Performed
1994-09-14 Liner Casing Operation Performed
1994-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-09-17 Perforation Treatment Performed - Jet Perforation
1994-09-17 Well Log Performed
1994-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-22 Well Began Production
1994-09-22 Well Fluid changed to Crude Oil
1994-09-22 Well Mode changed to Pumping
1999-11-01 Well Fluid changed to Crude Oil
1999-11-01 Well Mode changed to Suspended
2008-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-09-29 Well Fluid changed to Crude Oil
2008-09-29 Well Mode changed to Abandoned Zone
2008-10-01 Well Log Performed
2008-10-02 Perforation Treatment Performed - Cement Plug
2008-10-02 Perforation Treatment Performed - Jet Perforation
2008-10-02 Well Log Performed
2008-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-10-03 Perforation Treatment Performed - Remedial Casing
2008-10-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-10-06 Well Log Performed
2008-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-10-08 Plug Back Performed
2014-03-19 Well Abandoned
2014-03-19 Well Fluid changed to Crude Oil
2014-03-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-09-02 Open Hole/Barefoot Completion 1463.50 1475.00 0
2008-10-02 Perforation 1237.00 1238.00 20
2008-10-03 Remedial Casing Cementing 1237.00 1238.00 0
2008-10-03 Packing Device Capped w/Cement 1170.00 1224.00 0
2008-10-06 Packing Device Capped w/Cement 765.00 780.00 0
2008-10-08 Packing Device Capped w/Cement 453.00 468.00 0
1994-09-08 Acid Treatment 1463.50 1475.00 0
1994-09-12 Open Hole/Barefoot Completion 1475.00 1504.00 0
1994-09-14 Packing Device Capped w/Cement 1463.50 1504.00 0
1994-09-17 Perforation 1471.70 1472.70 13
1994-09-17 Perforation 1474.00 1475.00 13
1994-09-18 Acid Treatment 1471.70 1475.00 0
2008-09-29 Packing Device Capped w/Cement 1452.00 1462.00 0
2008-10-02 Cement Plug 1405.00 1437.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 2188 0.0 0.0 0.0
1995 2582 0.0 0.0 0.0
1996 7861 0.0 0.0 0.0
1997 3816 0.0 0.0 0.0

For data sources see[5]

References