X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0905051503000

Well Details

Well ID: 0905051503000
Loading map...
Location: 00/03-15-090-05W5/0
Location Alias: 00/03-15-90-05 W5M
Location Alias 2: 00/03-15-090-05 W5/00
Country: Canada
Province: Alberta
Township: 090
Meridian: 5
Range: 05
Section: 15
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED KIDNEY 3-15-90-5
Operator Name: Highwood Oil Company Ltd.
License Number: 0155837
License Date: 1993-01-21
License Status: Abandoned
Spud Date: 1993-01-27
Final Drill Date: 1993-02-03
Well Total Depth: 1483.50 m
Surface Hole Latitude: 56.801779
Surface Hole Longitude: -114.710275

For data sources see[1][2]

Well History

Date Event
1993-01-21 Obtained License
1993-01-29 Surface Casing Operation Performed
1993-01-30 Lost Circulation Occurred
1993-02-02 Production Casing Operation Performed
1993-02-03 Finished Drilling
1993-02-03 Perforation Treatment Performed - Open-Hole Completion
1993-02-03 Well Log Performed
1993-02-03 Well Mode changed to Drilled and Cased
1993-02-04 Rig Released
1993-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-02-09 Perforation Treatment Performed - Open-Hole Completion
1993-02-17 Well Began Production
1993-02-17 Well Fluid changed to Crude Oil
1993-02-17 Well Mode changed to Pumping
1993-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-03-12 Perforation Treatment Performed - Open-Hole Completion
1993-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-01 Well Fluid changed to Crude Oil
1995-01-01 Well Mode changed to Suspended
2002-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-07 Plug Back Performed
2002-02-07 Well Fluid changed to Crude Oil
2002-02-07 Well Mode changed to Abandoned Zone
2002-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-08 Plug Back Performed
2002-02-14 Well Abandoned
2002-02-14 Well Fluid changed to Crude Oil
2002-02-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-02-03 Open Hole/Barefoot Completion 1460.00 1478.00 0
1993-02-07 Acid Treatment 1460.00 1478.00 0
1993-02-09 Open Hole/Barefoot Completion 1460.00 1481.70 0
1993-03-10 Acid Treatment 1460.00 1481.70 0
1993-03-12 Open Hole/Barefoot Completion 1460.00 1483.50 0
1993-03-13 Acid Treatment 1460.00 1483.50 0
2002-02-07 Packing Device Capped w/Cement 1446.00 1454.00 0
2002-02-08 Packing Device Capped w/Cement 824.50 832.50 0
2002-02-08 Packing Device Capped w/Cement 635.00 643.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 876 0.0 0.0 0.0
1994 1408 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-01-30 Lost Circulation 580.00 600.00

For data sources see[6]

References