X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0905050910000

Well Details

Well ID: 0905050910000
Loading map...
Location: 00/10-09-090-05W5/0
Location Alias: 00/10-09-90-05 W5M
Location Alias 2: 00/10-09-090-05 W5/00
Country: Canada
Province: Alberta
Township: 090
Meridian: 5
Range: 05
Section: 09
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED KIDNEY 10-9-90-5
Operator Name: Highwood Oil Company Ltd.
License Number: 0132224
License Date: 1988-02-12
License Status: Suspension
Spud Date: 1988-02-20
Final Drill Date: 1988-03-06
Well Total Depth: 1580.00 m
Surface Hole Latitude: 56.798758
Surface Hole Longitude: -114.726591

For data sources see[1][2]

Well History

Date Event
1988-02-12 Obtained License
1988-02-20 Direction Drilling Operation Performed - Deviate
1988-02-25 Surface Casing Operation Performed
1988-02-26 Lost Circulation Occurred
1988-02-28 Intermediate Casing Operation Performed
1988-03-01 Well Log Performed
1988-03-04 Lost Circulation Occurred
1988-03-05 Lost Circulation Occurred
1988-03-06 Finished Drilling
1988-03-06 Well Mode changed to Drilled and Cased
1988-03-07 Well Log Performed
1988-03-08 Production Casing Operation Performed
1988-03-08 Rig Released
1988-03-15 Perforation Treatment Performed - Jet Perforation
1988-03-15 Well Log Performed
1988-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-16 Well Began Production
1988-03-16 Well Fluid changed to Crude Oil
1988-03-16 Well Mode changed to Flowing
1988-09-12 Well Fluid changed to Crude Oil
1988-09-12 Well Mode changed to Pumping
1998-01-10 Perforation Treatment Performed - Chemical Squeeze
2013-04-30 Well Fluid changed to Crude Oil
2013-04-30 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-02-20 45.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-03-15 Perforation 1544.00 1546.00 13
1988-03-16 Acid Treatment 1544.00 1546.00 0
1998-01-10 Chemical Squeeze 1544.00 1546.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 5935 0.0 0.0 0.0
1989 7536 0.0 0.0 0.0
1990 7827 0.0 0.0 0.0
1991 7720 0.0 0.0 0.0
1992 7871 0.0 0.0 0.0
1993 8051 0.0 0.0 0.0
1994 7934 0.0 0.0 0.0
1995 8370 0.0 0.0 0.0
1996 8466 0.0 0.0 0.0
1997 8179 0.0 0.0 0.0
1998 8021 0.0 0.0 0.0
1999 8082 0.0 0.0 0.0
2000 8261 0.0 0.0 0.0
2001 2243 0.0 0.0 0.0
2002 3998 0.0 0.0 0.0
2003 8579 0.0 0.0 0.0
2004 7527 0.0 0.0 0.0
2005 8752 0.0 0.0 0.0
2006 8506 0.0 0.0 0.0
2007 8569 0.0 0.0 0.0
2008 8739 0.0 0.0 0.0
2009 8095 0.0 0.0 0.0
2010 8638 0.0 0.0 0.0
2011 8174 0.0 0.0 0.0
2012 8334 0.0 0.0 0.0
2013 2876 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-02-26 Lost Circulation 662.00 662.00
1988-03-04 Lost Circulation 1491.00 1491.00
1988-03-05 Lost Circulation 1541.00 1541.00

For data sources see[7]

References