X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0896060803000

Well Details

Well ID: 0896060803000
Loading map...
Location: 00/03-08-089-06W6/0
Location Alias: 00/03-08-89-06 W6M
Location Alias 2: 00/03-08-089-06 W6/00
Country: Canada
Province: Alberta
Township: 089
Meridian: 6
Range: 06
Section: 08
County/Municipality: Clear Hills County
Well Name: SYDCO CHARLIE 3-8-89-6
Operator Name: Sydco Energy Inc.
License Number: 0216519
License Date: 1998-07-16
License Status: Suspension
Spud Date: 1998-08-05
Final Drill Date: 1998-08-10
Well Total Depth: 1235.00 m
Surface Hole Latitude: 56.699578
Surface Hole Longitude: -118.922881

For data sources see[1][2]

Well History

Date Event
1998-07-16 Obtained License
1998-08-05 Well Log Performed
1998-08-06 Surface Casing Operation Performed
1998-08-10 Finished Drilling
1998-08-10 Well Log Performed
1998-08-10 Well Mode changed to Drilled and Cased
1998-08-11 Drill Stem Test Performed
1998-08-13 Production Casing Operation Performed
1998-08-13 Rig Released
1998-08-20 Perforation Treatment Performed - Jet Perforation
1998-08-20 Well Log Performed
1998-08-26 Well Began Production
1998-08-26 Well Fluid changed to Crude Oil
1998-08-26 Well Mode changed to Pumping
1998-10-25 Perforation Treatment Performed - Cement Plug
1998-10-25 Plug Back Performed
1998-10-26 Perforation Treatment Performed - Jet Perforation
1998-10-26 Well Log Performed
2001-10-01 Well Fluid changed to Crude Oil
2001-10-01 Well Mode changed to Suspended
2003-07-14 Perforation Treatment Performed - Jet Perforation
2003-07-14 Well Log Performed
2020-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-28 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-08-20 Perforation 1180.00 1181.00 13
1998-08-20 Perforation 1182.50 1184.50 13
1998-10-25 Cement Plug 1179.60 1179.80 0
1998-10-26 Perforation 1177.00 1179.00 13
2003-07-14 Perforation 1176.40 1178.40 17
2020-01-28 Packing Device Capped w/Cement 1159.00 1167.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 1552 0.0 0.0 0.0
1999 768 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-28 No Incident Encountered 0.00 0.00

For data sources see[6]

References