X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0895032702000

Well Details

Well ID: 0895032702000
Loading map...
Location: 00/02-27-089-03W5/0
Location Alias: 00/02-27-89-03 W5M
Location Alias 2: 00/02-27-089-03 W5/00
Country: Canada
Province: Alberta
Township: 089
Meridian: 5
Range: 03
Section: 27
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED TROUT 2-27-89-3
Operator Name: Highwood Oil Company Ltd.
License Number: 0136788
License Date: 1988-10-05
License Status: Issued
Spud Date: 1988-10-09
Final Drill Date: 1988-10-26
Well Total Depth: 1502.00 m
Surface Hole Latitude: 56.743095
Surface Hole Longitude: -114.382861

For data sources see[1][2]

Well History

Date Event
1988-10-05 Obtained License
1988-10-11 Surface Casing Operation Performed
1988-10-12 Lost Circulation Occurred
1988-10-14 Kick Occurred
1988-10-15 Intermediate Casing Operation Performed
1988-10-26 Finished Drilling
1988-10-26 Well Log Performed
1988-10-26 Well Mode changed to Drilled and Cased
1988-10-27 Drill Stem Test Performed
1988-10-28 Drill Stem Test Performed
1988-10-29 Production Casing Operation Performed
1988-10-30 Rig Released
1988-11-26 Well Log Performed
1988-12-01 Well Log Performed
1988-12-02 Perforation Treatment Performed - Jet Perforation
1988-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-12-04 Well Log Performed
1988-12-12 Well Began Production
1988-12-12 Well Fluid changed to Crude Oil
1988-12-12 Well Mode changed to Pumping
1993-06-07 Well Log Performed
1993-06-08 Perforation Treatment Performed - Jet Perforation
1993-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-06-09 Well Log Performed
1995-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-12-02 Perforation 1446.00 1447.50 14
1993-06-09 Acid Treatment 1446.00 1456.50 0
1995-12-04 Acid Treatment 1446.00 1453.00 0
1988-12-02 Perforation 1451.00 1453.00 14
1988-12-02 Perforation 1455.50 1456.50 14
1988-12-02 Perforation 1459.00 1463.00 14
1988-12-03 Acid Treatment 1446.00 1463.00 0
1993-06-08 Perforation 1446.00 1447.50 13
1993-06-08 Perforation 1451.00 1453.00 13
1993-06-08 Perforation 1455.50 1456.50 13
1993-06-08 Perforation 1459.00 1463.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 456 0.0 0.0 0.0
1989 7598 0.0 0.0 0.0
1990 8225 0.0 0.0 0.0
1991 7982 0.0 0.0 0.0
1992 8361 0.0 0.0 0.0
1993 7651 0.0 0.0 0.0
1994 6607 0.0 0.0 0.0
1995 6112 0.0 0.0 0.0
1996 8701 0.0 0.0 0.0
1997 8644 0.0 0.0 0.0
1998 8422 0.0 0.0 0.0
1999 8315 0.0 0.0 0.0
2000 8766 0.0 0.0 0.0
2001 8748 0.0 0.0 0.0
2002 8691 0.0 0.0 0.0
2003 8689 0.0 0.0 0.0
2004 8755 0.0 0.0 0.0
2005 8729 0.0 0.0 0.0
2006 8573 0.0 0.0 0.0
2007 8705 0.0 0.0 0.0
2008 8527 0.0 0.0 0.0
2009 8701 0.0 0.0 0.0
2010 8758 0.0 0.0 0.0
2011 8614 0.0 0.0 0.0
2012 8310 0.0 0.0 0.0
2013 8690 0.0 0.0 0.0
2014 7601 0.0 0.0 0.0
2015 8747 0.0 0.0 0.0
2016 8694 0.0 0.0 0.0
2017 8459 0.0 0.0 0.0
2018 6656 0.0 0.0 0.0
2019 8459 0.0 0.0 0.0
2020 1920 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-10-12 Lost Circulation 605.00 605.00
1988-10-14 Kick 932.00 932.00

For data sources see[6]

References