If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0886102112000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.645872,"lon":-119.519674,"icon":""}]} |
Location: 00/12-21-088-10W6/0 | |
Location Alias: 00/12-21-88-10 W6M | |
Location Alias 2: 00/12-21-088-10 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 088 | |
Meridian: 6 | |
Range: 10 | |
Section: 21 | |
County/Municipality: Clear Hills County | |
Well Name: BIRCHCLIFF HZ WORSLEY 12-21-88-10 | |
Operator Name: Enercapita Energy Ltd. | |
License Number: 0440733 | |
License Date: 2011-12-09 | |
License Status: Issued | |
Spud Date: 2012-01-04 | |
Final Drill Date: 2012-01-14 | |
Well Total Depth: 2650.80 m | |
Surface Hole Latitude: 56.645872 | |
Surface Hole Longitude: -119.519674 |
Date | Event |
---|---|
2011-12-09 | Obtained License |
2012-01-05 | Surface Casing Operation Performed |
2012-01-07 | Direction Drilling Operation Performed - Horizontal |
2012-01-09 | Production Casing Operation Performed |
2012-01-10 | Well Log Performed |
2012-01-14 | Finished Drilling |
2012-01-14 | Well Mode changed to Drilled and Cased |
2012-01-15 | Liner Casing Operation Performed |
2012-01-16 | Rig Released |
2012-01-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-26 | Perforation Treatment Performed - Open-Hole Completion |
2012-02-11 | Well Began Production |
2012-02-11 | Well Fluid changed to Crude Oil |
2012-02-11 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-07 | 1139.90 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-26 | Open Hole/Barefoot Completion | 2645.00 | 2650.80 | 0 |
2012-01-26 | Multi-Stage Fracture | 2005.60 | 2006.40 | 0 |
2012-01-26 | Multi-Stage Fracture | 1922.90 | 1923.70 | 0 |
2012-01-26 | Multi-Stage Fracture | 1840.20 | 1841.00 | 0 |
2012-01-26 | Multi-Stage Fracture | 1757.60 | 1758.40 | 0 |
2012-01-26 | Multi-Stage Fracture | 1675.00 | 1675.80 | 0 |
2012-01-26 | Multi-Stage Fracture | 1605.30 | 1606.10 | 0 |
2012-01-26 | Multi-Stage Fracture | 1496.70 | 1497.50 | 0 |
2012-01-26 | Multi-Stage Fracture | 2640.50 | 2641.30 | 0 |
2012-01-26 | Multi-Stage Fracture | 2558.60 | 2559.40 | 0 |
2012-01-26 | Multi-Stage Fracture | 2476.00 | 2476.80 | 0 |
2012-01-26 | Multi-Stage Fracture | 2406.20 | 2407.00 | 0 |
2012-01-26 | Multi-Stage Fracture | 2323.50 | 2324.30 | 0 |
2012-01-26 | Multi-Stage Fracture | 2241.20 | 2242.00 | 0 |
2012-01-26 | Multi-Stage Fracture | 2158.60 | 2159.40 | 0 |
2012-01-26 | Multi-Stage Fracture | 2075.50 | 2076.30 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7042 | 0.0 | 0.0 | 0.0 |
2013 | 8337 | 0.0 | 0.0 | 0.0 |
2014 | 8441 | 0.0 | 0.0 | 0.0 |
2015 | 8476 | 0.0 | 0.0 | 0.0 |
2016 | 7154 | 0.0 | 0.0 | 0.0 |
2017 | 8425 | 0.0 | 0.0 | 0.0 |
2018 | 5627 | 0.0 | 0.0 | 0.0 |
2019 | 8319 | 0.0 | 0.0 | 0.0 |
2020 | 2147 | 0.0 | 0.0 | 0.0 |
For data sources see[6]