X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0886101705000

Well Details

Well ID: 0886101705000
Loading map...
Location: 00/05-17-088-10W6/0
Location Alias: 00/05-17-88-10 W6M
Location Alias 2: 00/05-17-088-10 W6/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 6
Range: 10
Section: 17
County/Municipality: Clear Hills County
Well Name: CPEC WORSLEY 5-17-88-10
Operator Name: Enercapita Energy Ltd.
License Number: 0441545
License Date: 2011-12-16
License Status: Issued
Spud Date: 2012-01-19
Final Drill Date: 2012-01-31
Well Total Depth: 2903.00 m
Surface Hole Latitude: 56.633876
Surface Hole Longitude: -119.539840

For data sources see[1][2]

Well History

Date Event
2011-12-16 Obtained License
2012-01-20 Surface Casing Operation Performed
2012-01-21 Well Log Performed
2012-01-22 Direction Drilling Operation Performed - Deviate
2012-01-23 Direction Drilling Operation Performed - Horizontal
2012-01-24 Well Log Performed
2012-01-25 Intermediate Casing Operation Performed
2012-01-31 Finished Drilling
2012-01-31 Well Log Performed
2012-01-31 Well Mode changed to Drilled and Cased
2012-02-02 Liner Casing Operation Performed
2012-02-02 Perforation Treatment Performed - Open-Hole Completion
2012-02-03 Rig Released
2012-02-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-21 Well Log Performed
2012-04-01 Well Began Production
2012-04-01 Well Fluid changed to Crude Oil
2012-04-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-19 Trinidad Drilling Ltd. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-22 818.00 Deviate (5 - 79 degrees)
2012-01-23 1332.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-02 Open Hole/Barefoot Completion 2885.00 2903.00 0
2012-02-14 Multi-Stage Fracture 2022.40 2022.50 0
2012-02-14 Multi-Stage Fracture 1929.80 1929.90 0
2012-02-14 Multi-Stage Fracture 1849.20 1849.30 0
2012-02-14 Multi-Stage Fracture 1768.70 1768.80 0
2012-02-14 Multi-Stage Fracture 1675.20 1675.30 0
2012-02-14 Multi-Stage Fracture 1594.70 1594.80 0
2012-02-14 Multi-Stage Fracture 1513.60 1513.70 0
2012-02-14 Multi-Stage Fracture 1446.30 1446.40 0
2012-02-13 Multi-Stage Fracture 2880.00 2880.10 0
2012-02-13 Multi-Stage Fracture 2773.60 2773.70 0
2012-02-13 Multi-Stage Fracture 2655.10 2655.20 0
2012-02-14 Multi-Stage Fracture 2549.70 2549.80 0
2012-02-14 Multi-Stage Fracture 2431.90 2432.00 0
2012-02-14 Multi-Stage Fracture 2326.10 2326.20 0
2012-02-14 Multi-Stage Fracture 2221.20 2221.30 0
2012-02-14 Multi-Stage Fracture 2128.20 2128.30 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4805 0.0 0.0 0.0
2013 6089 0.0 0.0 0.0
2014 7251 0.0 0.0 0.0
2015 7228 0.0 0.0 0.0
2016 7295 0.0 0.0 0.0
2017 8189 0.0 0.0 0.0
2018 8374 0.0 0.0 0.0
2019 8400 0.0 0.0 0.0
2020 2129 0.0 0.0 0.0

For data sources see[7]

References