If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0886101705000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.633876,"lon":-119.53984,"icon":""}]} |
Location: 00/05-17-088-10W6/0 | |
Location Alias: 00/05-17-88-10 W6M | |
Location Alias 2: 00/05-17-088-10 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 088 | |
Meridian: 6 | |
Range: 10 | |
Section: 17 | |
County/Municipality: Clear Hills County | |
Well Name: CPEC WORSLEY 5-17-88-10 | |
Operator Name: Enercapita Energy Ltd. | |
License Number: 0441545 | |
License Date: 2011-12-16 | |
License Status: Issued | |
Spud Date: 2012-01-19 | |
Final Drill Date: 2012-01-31 | |
Well Total Depth: 2903.00 m | |
Surface Hole Latitude: 56.633876 | |
Surface Hole Longitude: -119.539840 |
Date | Event |
---|---|
2011-12-16 | Obtained License |
2012-01-20 | Surface Casing Operation Performed |
2012-01-21 | Well Log Performed |
2012-01-22 | Direction Drilling Operation Performed - Deviate |
2012-01-23 | Direction Drilling Operation Performed - Horizontal |
2012-01-24 | Well Log Performed |
2012-01-25 | Intermediate Casing Operation Performed |
2012-01-31 | Finished Drilling |
2012-01-31 | Well Log Performed |
2012-01-31 | Well Mode changed to Drilled and Cased |
2012-02-02 | Liner Casing Operation Performed |
2012-02-02 | Perforation Treatment Performed - Open-Hole Completion |
2012-02-03 | Rig Released |
2012-02-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-21 | Well Log Performed |
2012-04-01 | Well Began Production |
2012-04-01 | Well Fluid changed to Crude Oil |
2012-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-19 | Trinidad Drilling Ltd. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-22 | 818.00 | Deviate (5 - 79 degrees) |
2012-01-23 | 1332.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-02 | Open Hole/Barefoot Completion | 2885.00 | 2903.00 | 0 |
2012-02-14 | Multi-Stage Fracture | 2022.40 | 2022.50 | 0 |
2012-02-14 | Multi-Stage Fracture | 1929.80 | 1929.90 | 0 |
2012-02-14 | Multi-Stage Fracture | 1849.20 | 1849.30 | 0 |
2012-02-14 | Multi-Stage Fracture | 1768.70 | 1768.80 | 0 |
2012-02-14 | Multi-Stage Fracture | 1675.20 | 1675.30 | 0 |
2012-02-14 | Multi-Stage Fracture | 1594.70 | 1594.80 | 0 |
2012-02-14 | Multi-Stage Fracture | 1513.60 | 1513.70 | 0 |
2012-02-14 | Multi-Stage Fracture | 1446.30 | 1446.40 | 0 |
2012-02-13 | Multi-Stage Fracture | 2880.00 | 2880.10 | 0 |
2012-02-13 | Multi-Stage Fracture | 2773.60 | 2773.70 | 0 |
2012-02-13 | Multi-Stage Fracture | 2655.10 | 2655.20 | 0 |
2012-02-14 | Multi-Stage Fracture | 2549.70 | 2549.80 | 0 |
2012-02-14 | Multi-Stage Fracture | 2431.90 | 2432.00 | 0 |
2012-02-14 | Multi-Stage Fracture | 2326.10 | 2326.20 | 0 |
2012-02-14 | Multi-Stage Fracture | 2221.20 | 2221.30 | 0 |
2012-02-14 | Multi-Stage Fracture | 2128.20 | 2128.30 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 4805 | 0.0 | 0.0 | 0.0 |
2013 | 6089 | 0.0 | 0.0 | 0.0 |
2014 | 7251 | 0.0 | 0.0 | 0.0 |
2015 | 7228 | 0.0 | 0.0 | 0.0 |
2016 | 7295 | 0.0 | 0.0 | 0.0 |
2017 | 8189 | 0.0 | 0.0 | 0.0 |
2018 | 8374 | 0.0 | 0.0 | 0.0 |
2019 | 8400 | 0.0 | 0.0 | 0.0 |
2020 | 2129 | 0.0 | 0.0 | 0.0 |
For data sources see[7]