X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0886101512020

Well Details

Well ID: 0886101512020
Loading map...
Location: 02/12-15-088-10W6/0
Location Alias: 02/12-15-88-10 W6M
Location Alias 2: 02/12-15-088-10 W6/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 6
Range: 10
Section: 15
County/Municipality: Clear Hills County
Well Name: BIRCHCLIFF WORSLEY 12-15-88-10
Operator Name: Enercapita Energy Ltd.
License Number: 0411549
License Date: 2009-07-23
License Status: Issued
Spud Date: 2009-08-20
Final Drill Date: 2009-09-02
Well Total Depth: 2460.00 m
Surface Hole Latitude: 56.634737
Surface Hole Longitude: -119.495264

For data sources see[1][2]

Well History

Date Event
2009-07-23 Obtained License
2009-08-20 Surface Casing Operation Performed
2009-08-23 Direction Drilling Operation Performed - Horizontal
2009-08-26 Intermediate Casing Operation Performed
2009-08-26 Well Log Performed
2009-09-02 Finished Drilling
2009-09-02 Well Log Performed
2009-09-02 Well Mode changed to Drilled and Cased
2009-09-04 Liner Casing Operation Performed
2009-09-04 Rig Released
2009-09-09 Well Log Performed
2009-09-20 Perforation Treatment Performed - Multi-Stage Fracture
2009-09-20 Perforation Treatment Performed - Open-Hole Completion
2009-09-25 Perforation Treatment Performed - Multi-Stage Fracture
2009-10-13 Well Began Production
2009-10-13 Well Fluid changed to Crude Oil
2009-10-13 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-08-23 1048.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-09-20 Open Hole/Barefoot Completion 2410.00 2460.00 0
2009-09-25 Multi-Stage Fracture 1523.20 1524.00 0
2009-09-25 Multi-Stage Fracture 1420.50 1421.30 0
2009-09-20 Multi-Stage Fracture 2405.50 2406.30 0
2009-09-20 Multi-Stage Fracture 2289.20 2290.00 0
2009-09-20 Multi-Stage Fracture 2187.30 2188.10 0
2009-09-20 Multi-Stage Fracture 2073.30 2074.10 0
2009-09-25 Multi-Stage Fracture 1970.80 1971.60 0
2009-09-25 Multi-Stage Fracture 1855.30 1856.10 0
2009-09-25 Multi-Stage Fracture 1740.90 1741.70 0
2009-09-25 Multi-Stage Fracture 1638.10 1638.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 1900 0.0 0.0 0.0
2010 8142 0.0 0.0 0.0
2011 8245 0.0 0.0 0.0
2012 2479 0.0 0.0 0.0
2013 7806 0.0 0.0 0.0
2014 7606 0.0 0.0 0.0
2015 8392 0.0 0.0 0.0
2016 5295 0.0 0.0 0.0
2017 2870 0.0 0.0 0.0
2018 8315 0.0 0.0 0.0
2019 7781 0.0 0.0 0.0
2020 2031 0.0 0.0 0.0

For data sources see[6]

References