X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0886101501000

Well Details

Well ID: 0886101501000
Loading map...
Location: 00/01-15-088-10W6/0
Location Alias: 00/01-15-88-10 W6M
Location Alias 2: 00/01-15-088-10 W6/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 6
Range: 10
Section: 15
County/Municipality: Clear Hills County
Well Name: BIRCHCLIFF 5-15HZ WORSLEY 1-15-88-10
Operator Name: Enercapita Energy Ltd.
License Number: 0435255
License Date: 2011-07-19
License Status: Issued
Spud Date: 2011-07-31
Final Drill Date: 2011-08-10
Well Total Depth: 2581.50 m
Surface Hole Latitude: 56.628575
Surface Hole Longitude: -119.516657

For data sources see[1][2]

Well History

Date Event
2011-07-19 Obtained License
2011-08-01 Surface Casing Operation Performed
2011-08-02 Direction Drilling Operation Performed - Horizontal
2011-08-03 Well Log Performed
2011-08-04 Intermediate Casing Operation Performed
2011-08-10 Finished Drilling
2011-08-10 Well Log Performed
2011-08-10 Well Mode changed to Drilled and Cased
2011-08-11 Liner Casing Operation Performed
2011-08-11 Well Log Performed
2011-08-12 Rig Released
2011-08-24 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-24 Perforation Treatment Performed - Open-Hole Completion
2011-09-04 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-04 Well Began Production
2011-10-04 Well Fluid changed to Crude Oil
2011-10-04 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-02 325.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-24 Open Hole/Barefoot Completion 2576.00 2581.50 0
2011-09-04 Multi-Stage Fracture 1680.10 1680.90 0
2011-09-04 Multi-Stage Fracture 1590.00 1590.80 0
2011-09-04 Multi-Stage Fracture 1511.00 1511.80 0
2011-09-04 Multi-Stage Fracture 1420.40 1421.20 0
2011-09-04 Multi-Stage Fracture 1330.20 1331.00 0
2011-08-24 Multi-Stage Fracture 2510.50 2511.30 0
2011-08-24 Multi-Stage Fracture 2444.60 2445.40 0
2011-08-24 Multi-Stage Fracture 2341.50 2342.30 0
2011-08-24 Multi-Stage Fracture 2288.10 2288.90 0
2011-08-24 Multi-Stage Fracture 2234.30 2235.10 0
2011-09-04 Multi-Stage Fracture 1951.20 1952.00 0
2011-09-04 Multi-Stage Fracture 1811.80 1812.60 0
2011-09-04 Multi-Stage Fracture 1745.90 1746.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1526 0.0 0.0 0.0
2012 8159 0.0 0.0 0.0
2013 8111 0.0 0.0 0.0
2014 8249 0.0 0.0 0.0
2015 8188 0.0 0.0 0.0
2016 7586 0.0 0.0 0.0
2017 8118 0.0 0.0 0.0
2018 8303 0.0 0.0 0.0
2019 7636 0.0 0.0 0.0
2020 2101 0.0 0.0 0.0

For data sources see[6]

References