X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0886100912000

Well Details

Well ID: 0886100912000
Loading map...
Location: 00/12-09-088-10W6/0
Location Alias: 00/12-09-88-10 W6M
Location Alias 2: 00/12-09-088-10 W6/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 6
Range: 10
Section: 09
County/Municipality: Clear Hills County
Well Name: BIRCHCLIFF 13-10 WORSLEY 12-9-88-10
Operator Name: Enercapita Energy Ltd.
License Number: 0445194
License Date: 2012-04-02
License Status: Issued
Spud Date: 2012-06-02
Final Drill Date: 2012-06-13
Well Total Depth: 2621.00 m
Surface Hole Latitude: 56.621458
Surface Hole Longitude: -119.516848

For data sources see[1][2]

Well History

Date Event
2012-04-02 Obtained License
2012-06-02 Surface Casing Operation Performed
2012-06-04 Direction Drilling Operation Performed - Deviate
2012-06-06 Direction Drilling Operation Performed - Horizontal
2012-06-07 Intermediate Casing Operation Performed
2012-06-08 Well Log Performed
2012-06-13 Finished Drilling
2012-06-13 Well Mode changed to Drilled and Cased
2012-06-14 Liner Casing Operation Performed
2012-06-16 Rig Released
2012-06-27 Perforation Treatment Performed - Multi-Stage Fracture
2012-06-27 Perforation Treatment Performed - Open-Hole Completion
2012-07-14 Well Began Production
2012-07-14 Well Fluid changed to Crude Oil
2012-07-14 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-06-02 Excalibur Drilling Ltd. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-06-04 845.10 Deviate (5 - 79 degrees)
2012-06-06 1265.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-06-27 Open Hole/Barefoot Completion 2618.00 2621.00 0
2012-06-27 Multi-Stage Fracture 1757.90 1758.70 0
2012-06-27 Multi-Stage Fracture 1661.60 1662.40 0
2012-06-27 Multi-Stage Fracture 1563.20 1564.00 0
2012-06-27 Multi-Stage Fracture 1464.60 1465.40 0
2012-06-27 Multi-Stage Fracture 1355.20 1356.00 0
2012-06-27 Multi-Stage Fracture 2572.70 2573.50 0
2012-06-27 Multi-Stage Fracture 2459.10 2459.90 0
2012-06-27 Multi-Stage Fracture 2359.60 2360.40 0
2012-06-27 Multi-Stage Fracture 2259.80 2260.60 0
2012-06-27 Multi-Stage Fracture 2160.40 2161.20 0
2012-06-27 Multi-Stage Fracture 2062.50 2063.30 0
2012-06-27 Multi-Stage Fracture 1964.90 1965.70 0
2012-06-27 Multi-Stage Fracture 1856.10 1856.90 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3548 0.0 0.0 0.0
2013 7768 0.0 0.0 0.0
2014 7675 0.0 0.0 0.0
2015 7595 0.0 0.0 0.0
2016 6443 0.0 0.0 0.0
2017 5302 0.0 0.0 0.0
2018 8380 0.0 0.0 0.0
2019 8141 0.0 0.0 0.0
2020 2149 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-16 No Incident Encountered 0.00 0.00
2012-07-04 No Incident Encountered 0.00 0.00

For data sources see[8]

References