X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0886091905000

Well Details

Well ID: 0886091905000
Loading map...
Location: 00/05-19-088-09W6/0
Location Alias: 00/05-19-88-09 W6M
Location Alias 2: 00/05-19-088-09 W6/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 6
Range: 09
Section: 19
County/Municipality: Clear Hills County
Well Name: BIRCHCLIFF WORSLEY 5-19-88-9
Operator Name: Enercapita Energy Ltd.
License Number: 0421328
License Date: 2010-06-22
License Status: Issued
Spud Date: 2010-08-11
Final Drill Date: 2010-08-27
Well Total Depth: 3386.00 m
Surface Hole Latitude: 56.645496
Surface Hole Longitude: -119.465152

For data sources see[1][2]

Well History

Date Event
2010-06-22 Obtained License
2010-08-12 Surface Casing Operation Performed
2010-08-15 Direction Drilling Operation Performed - Horizontal
2010-08-19 Intermediate Casing Operation Performed
2010-08-27 Finished Drilling
2010-08-27 Well Mode changed to Drilled and Cased
2010-08-29 Liner Casing Operation Performed
2010-08-30 Rig Released
2010-09-15 Perforation Treatment Performed - Multi-Stage Fracture
2010-09-15 Perforation Treatment Performed - Open-Hole Completion
2010-09-16 Perforation Treatment Performed - Multi-Stage Fracture
2010-09-21 Well Began Production
2010-09-21 Well Fluid changed to Crude Oil
2010-09-21 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-08-15 1178.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-09-15 Open Hole/Barefoot Completion 3175.00 3386.00 0
2010-09-15 Multi-Stage Fracture 2135.50 2136.30 0
2010-09-16 Multi-Stage Fracture 2019.80 2020.60 0
2010-09-16 Multi-Stage Fracture 1904.70 1905.50 0
2010-09-16 Multi-Stage Fracture 1778.00 1778.80 0
2010-09-16 Multi-Stage Fracture 1663.60 1664.40 0
2010-09-16 Multi-Stage Fracture 1536.20 1537.00 0
2010-09-15 Open Hole/Barefoot Completion 3103.30 3104.10 0
2010-09-15 Multi-Stage Fracture 2975.60 2976.40 0
2010-09-15 Multi-Stage Fracture 2861.20 2862.00 0
2010-09-15 Multi-Stage Fracture 2734.90 2735.70 0
2010-09-15 Multi-Stage Fracture 2619.50 2620.30 0
2010-09-15 Multi-Stage Fracture 2504.80 2505.60 0
2010-09-15 Multi-Stage Fracture 2378.00 2378.80 0
2010-09-15 Multi-Stage Fracture 2262.80 2263.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1848 0.0 0.0 0.0
2011 7160 0.0 0.0 0.0
2012 7455 0.0 0.0 0.0
2013 8384 0.0 0.0 0.0
2014 8326 0.0 0.0 0.0
2015 8414 0.0 0.0 0.0
2016 5706 0.0 0.0 0.0
2018 4683 0.0 0.0 0.0
2019 6932 0.0 0.0 0.0

For data sources see[6]

References