If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0886051906000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.646072,"lon":-118.78692,"icon":""}]} |
Location: 00/06-19-088-05W6/0 | |
Location Alias: 00/06-19-88-05 W6M | |
Location Alias 2: 00/06-19-088-05 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 088 | |
Meridian: 6 | |
Range: 05 | |
Section: 19 | |
County/Municipality: Clear Hills County | |
Well Name: TOTAL ATAPCO WORSLEY 6-19-88-5 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0094196 | |
License Date: 1981-12-31 | |
License Status: RecCertified | |
Spud Date: 1982-01-06 | |
Final Drill Date: 1982-02-08 | |
Well Total Depth: 2655.00 m | |
Surface Hole Latitude: 56.646072 | |
Surface Hole Longitude: -118.786920 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1981-12-31 | Obtained License |
1982-01-06 | Lost Circulation Occurred |
1982-02-05 | Drill Stem Test Performed |
1982-02-08 | Finished Drilling |
1982-02-13 | Drill Stem Test Performed |
1982-02-15 | Production Casing Operation Performed |
1982-02-26 | Perforation Treatment Performed - Jet Perforation |
1982-03-03 | Perforation Treatment Performed - Jet Perforation |
1982-03-04 | Perforation Treatment Performed - Cement Squeeze |
1982-03-05 | Perforation Treatment Performed - Jet Perforation |
1982-03-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-03-10 | Well Mode changed to Drilled and Cased |
1983-09-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1983-09-15 | Well Abandoned |
1983-09-15 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-02-26 | Perforation | 1204.50 | 1208.00 | 7 |
1982-02-26 | Perforation | 1182.00 | 1185.50 | 13 |
1982-03-03 | Perforation | 1169.00 | 1171.00 | 7 |
1982-03-04 | Cement Squeeze | 1169.00 | 1185.50 | 0 |
1982-03-05 | Perforation | 1177.00 | 1179.50 | 13 |
1982-03-07 | Acid Treatment | 1177.00 | 1179.50 | 0 |
1983-09-15 | Packing Device Capped w/Cement | 1156.00 | 1165.00 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1982-01-06 | Lost Circulation | 142.00 | 142.00 |
For data sources see[5]