If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0886041909000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.648291,"lon":-118.616875,"icon":""}]} |
Location: 00/09-19-088-04W6/0 | |
Location Alias: 00/09-19-88-04 W6M | |
Location Alias 2: 00/09-19-088-04 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 088 | |
Meridian: 6 | |
Range: 04 | |
Section: 19 | |
County/Municipality: Clear Hills County | |
Well Name: TOTAL ATAPCO WORSLEY 9-19-88-4 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0073670 | |
License Date: 1978-12-28 | |
License Status: RecCertified | |
Spud Date: 1979-01-01 | |
Final Drill Date: 1979-02-06 | |
Well Total Depth: 2496.00 m | |
Surface Hole Latitude: 56.648291 | |
Surface Hole Longitude: -118.616875 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-12-28 | Obtained License |
1979-01-10 | Drill Stem Test Performed |
1979-02-06 | Finished Drilling |
1979-02-25 | Drill Stem Test Performed |
1979-02-26 | Drill Stem Test Performed |
1979-02-27 | Drill Stem Test Performed |
1979-03-02 | Drill Stem Test Performed |
1979-03-03 | Drill Stem Test Performed |
1979-03-04 | Drill Stem Test Performed |
1979-03-05 | Drill Stem Test Performed |
1979-03-06 | Drill Stem Test Performed |
1979-03-08 | Production Casing Operation Performed |
1979-03-08 | Well Mode changed to Drilled and Cased |
1979-08-05 | Perforation Treatment Performed - Jet Perforation |
1979-08-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-11-01 | Perforation Treatment Performed - Fractured |
1981-02-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-11-19 | Perforation Treatment Performed - Jet Perforation |
1982-07-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1982-07-03 | Well Abandoned |
1982-07-03 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-08-05 | Perforation | 2398.00 | 2399.00 | 4 |
1979-08-05 | Perforation | 2399.50 | 2404.00 | 4 |
1979-08-05 | Perforation | 2404.50 | 2405.50 | 4 |
1979-08-06 | Acid Treatment | 2398.00 | 2405.50 | 0 |
1979-11-01 | Fracture | 2398.00 | 2405.50 | 0 |
1981-02-14 | Packing Device Capped w/Cement | 2366.00 | 2375.00 | 0 |
1981-11-19 | Perforation | 1908.00 | 1913.00 | 13 |
1982-07-03 | Packing Device Capped w/Cement | 1887.00 | 1895.00 | 0 |
For data sources see[4]