X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0886041909000

Well Details

Well ID: 0886041909000
Loading map...
Location: 00/09-19-088-04W6/0
Location Alias: 00/09-19-88-04 W6M
Location Alias 2: 00/09-19-088-04 W6/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 6
Range: 04
Section: 19
County/Municipality: Clear Hills County
Well Name: TOTAL ATAPCO WORSLEY 9-19-88-4
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0073670
License Date: 1978-12-28
License Status: RecCertified
Spud Date: 1979-01-01
Final Drill Date: 1979-02-06
Well Total Depth: 2496.00 m
Surface Hole Latitude: 56.648291
Surface Hole Longitude: -118.616875

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-12-28 Obtained License
1979-01-10 Drill Stem Test Performed
1979-02-06 Finished Drilling
1979-02-25 Drill Stem Test Performed
1979-02-26 Drill Stem Test Performed
1979-02-27 Drill Stem Test Performed
1979-03-02 Drill Stem Test Performed
1979-03-03 Drill Stem Test Performed
1979-03-04 Drill Stem Test Performed
1979-03-05 Drill Stem Test Performed
1979-03-06 Drill Stem Test Performed
1979-03-08 Production Casing Operation Performed
1979-03-08 Well Mode changed to Drilled and Cased
1979-08-05 Perforation Treatment Performed - Jet Perforation
1979-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-01 Perforation Treatment Performed - Fractured
1981-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-11-19 Perforation Treatment Performed - Jet Perforation
1982-07-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-07-03 Well Abandoned
1982-07-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-08-05 Perforation 2398.00 2399.00 4
1979-08-05 Perforation 2399.50 2404.00 4
1979-08-05 Perforation 2404.50 2405.50 4
1979-08-06 Acid Treatment 2398.00 2405.50 0
1979-11-01 Fracture 2398.00 2405.50 0
1981-02-14 Packing Device Capped w/Cement 2366.00 2375.00 0
1981-11-19 Perforation 1908.00 1913.00 13
1982-07-03 Packing Device Capped w/Cement 1887.00 1895.00 0

For data sources see[4]



References