X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0886012205002

Well Details

Well ID: 0886012205002
Loading map...
Location: 00/05-22-088-01W6/2
Location Alias: 00/05-22-88-01 W6M
Location Alias 2: 00/05-22-088-01 W6/02
Country: Canada
Province: Alberta
Township: 088
Meridian: 6
Range: 01
Section: 22
County/Municipality: County of Northern Lights
Well Name: TRILOGY DIXON 5-22-88-1
Operator Name: Paramount Resources Ltd.
License Number: 0179417
License Date: 1995-07-20
License Status: Suspension
Spud Date: 1995-07-28
Final Drill Date: 1995-07-31
Well Total Depth: 935.00 m
Surface Hole Latitude: 56.643608
Surface Hole Longitude: -118.074218

For data sources see[1][2]

Well History

Date Event
1995-07-20 Obtained License
1995-07-29 Surface Casing Operation Performed
1995-07-31 Finished Drilling
1995-07-31 Well Log Performed
1995-07-31 Well Mode changed to Drilled and Cased
1995-08-01 Drill Stem Test Performed
1995-08-02 Production Casing Operation Performed
1995-08-02 Rig Released
1996-03-13 Well Log Performed
1996-03-14 Perforation Treatment Performed - Jet Perforation
1996-03-14 Well Log Performed
2001-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-04 Perforation Treatment Performed - Jet Perforation
2001-03-04 Well Mode changed to Drilled and Cased
2002-05-30 Perforation Treatment Performed - Cement Squeeze
2002-06-02 Perforation Treatment Performed - Cement Squeeze
2002-06-02 Perforation Treatment Performed - Jet Perforation
2002-06-05 Perforation Treatment Performed - Jet Perforation
2003-08-16 Perforation Treatment Performed - Cement Squeeze
2003-08-19 Perforation Treatment Performed - Jet Perforation
2003-08-21 Well Began Production
2003-08-21 Well Fluid changed to Gas
2003-08-21 Well Mode changed to Flowing
2007-12-31 Well Fluid changed to Gas
2007-12-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-03-14 Perforation 846.50 848.50 7
2003-08-16 Cement Squeeze 846.00 847.50 0
2003-08-19 Perforation 852.00 854.00 17
1996-03-14 Perforation 852.00 856.00 7
2001-03-04 Packing Device Capped w/Cement 837.00 845.00 0
2001-03-04 Perforation 832.00 833.00 17
2002-05-30 Cement Squeeze 832.00 833.00 0
2002-06-02 Perforation 846.50 848.50 17
2002-06-02 Perforation 852.00 856.00 17
2002-06-02 Cement Squeeze 846.50 856.00 0
2002-06-05 Perforation 846.00 847.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 1771 0.0 0.0 0.0
2004 4512 0.0 0.0 0.0
2005 7906 0.0 0.0 0.0
2006 7275 0.0 0.0 0.0
2007 8141 0.0 0.0 0.0

For data sources see[5]

References