X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885122616002

Well Details

Well ID: 0885122616002
Loading map...
Location: 00/16-26-088-12W5/2
Location Alias: 00/16-26-88-12 W5M
Location Alias 2: 00/16-26-088-12 W5/02
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 12
Section: 26
County/Municipality: Northern Sunrise County
Well Name: MBOG EVI 16-26-88-12
Operator Name: Surge Energy Inc.
License Number: 0438986
License Date: 2011-11-16
License Status: Amended
Spud Date: 2012-02-10
Final Drill Date: 2012-03-14
Well Total Depth: 3435.00 m
Surface Hole Latitude: 56.659584
Surface Hole Longitude: -115.813181

For data sources see[1][2]

Well History

Date Event
2011-11-16 Obtained License
2012-02-14 Surface Casing Operation Performed
2012-02-19 Direction Drilling Operation Performed - Deviate
2012-02-20 Direction Drilling Operation Performed - Horizontal
2012-02-25 Intermediate Casing Operation Performed
2012-03-08 Direction Drilling Operation Performed - Horizontal
2012-03-14 Finished Drilling
2012-03-14 Well Log Performed
2012-03-14 Well Mode changed to Drilled and Cased
2012-03-17 Liner Casing Operation Performed
2012-03-18 Rig Released
2012-05-06 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-06 Perforation Treatment Performed - Open-Hole Completion
2012-07-04 Well Began Production
2012-07-04 Well Fluid changed to Crude Oil
2012-07-04 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-02-19 1172.00 Deviate (5 - 79 degrees)
2012-02-20 1805.00 Horizontal
2012-03-08 1855.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-05-06 Open Hole/Barefoot Completion 3424.00 3435.00 0
2012-05-06 Multi-Stage Fracture 2877.00 2877.10 0
2012-05-06 Multi-Stage Fracture 2807.00 2807.10 0
2012-05-06 Multi-Stage Fracture 2737.20 2738.30 0
2012-05-06 Multi-Stage Fracture 2680.80 2680.90 0
2012-05-06 Multi-Stage Fracture 2610.80 2610.90 0
2012-05-06 Multi-Stage Fracture 2540.90 2541.00 0
2012-05-06 Multi-Stage Fracture 2484.50 2484.60 0
2012-05-06 Multi-Stage Fracture 2414.70 2414.80 0
2012-05-06 Multi-Stage Fracture 2358.20 2358.30 0
2012-05-06 Multi-Stage Fracture 2288.20 2288.30 0
2012-05-06 Multi-Stage Fracture 3394.90 3395.00 0
2012-05-06 Multi-Stage Fracture 2218.40 2218.50 0
2012-05-06 Multi-Stage Fracture 2162.20 2162.30 0
2012-05-06 Open Hole/Barefoot Completion 1855.00 1856.40 0
2012-05-06 Multi-Stage Fracture 3325.30 3325.40 0
2012-05-06 Multi-Stage Fracture 3269.00 3269.10 0
2012-05-06 Multi-Stage Fracture 3199.00 3199.10 0
2012-05-06 Multi-Stage Fracture 3129.10 3129.20 0
2012-05-06 Multi-Stage Fracture 3072.90 3073.00 0
2012-05-06 Multi-Stage Fracture 3003.20 3003.30 0
2012-05-06 Multi-Stage Fracture 2933.40 2933.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4089 0.0 0.0 0.0
2013 8680 0.0 0.0 0.0
2014 8476 0.0 0.0 0.0
2015 8568 0.0 0.0 0.0
2016 7287 0.0 0.0 0.0
2017 8404 0.0 0.0 0.0
2018 8443 0.0 0.0 0.0
2019 8508 0.0 0.0 0.0
2020 1192 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-18 No Incident Encountered 0.00 0.00
2012-06-29 No Incident Encountered 0.00 0.00

For data sources see[7]

References