X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885122412020

Well Details

Well ID: 0885122412020
Loading map...
Location: 02/12-24-088-12W5/0
Location Alias: 02/12-24-88-12 W5M
Location Alias 2: 02/12-24-088-12 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 12
Section: 24
County/Municipality: Northern Sunrise County
Well Name: MBOG EVI 12-24-88-12
Operator Name: Surge Energy Inc.
License Number: 0446118
License Date: 2012-05-28
License Status: Issued
Spud Date: 2012-07-16
Final Drill Date: 2012-08-01
Well Total Depth: 3135.00 m
Surface Hole Latitude: 56.646778
Surface Hole Longitude: -115.753074

For data sources see[1][2]

Well History

Date Event
2012-05-28 Obtained License
2012-07-21 Surface Casing Operation Performed
2012-07-23 Well Log Performed
2012-07-25 Direction Drilling Operation Performed - Deviate
2012-07-26 Direction Drilling Operation Performed - Horizontal
2012-07-26 Well Log Performed
2012-07-27 Intermediate Casing Operation Performed
2012-08-01 Finished Drilling
2012-08-01 Well Log Performed
2012-08-01 Well Structure changed to Drain
2012-08-03 Liner Casing Operation Performed
2012-08-13 Well Log Performed
2012-08-14 Rig Released
2012-09-23 Well Log Performed
2012-10-24 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-24 Perforation Treatment Performed - Open-Hole Completion
2012-10-25 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-25 Perforation Treatment Performed - Open-Hole Completion

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-07-16 Bonanza Drilling Inc. 5 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-07-25 1252.80 Deviate (5 - 79 degrees)
2012-07-26 1614.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-24 Open Hole/Barefoot Completion 3125.00 3135.00 0
2012-10-24 Multi-Stage Fracture 2609.20 2609.30 0
2012-10-24 Multi-Stage Fracture 2550.10 2550.20 0
2012-10-25 Multi-Stage Fracture 2490.90 2491.00 0
2012-10-25 Multi-Stage Fracture 2418.20 2418.30 0
2012-10-25 Multi-Stage Fracture 2361.70 2361.80 0
2012-10-25 Multi-Stage Fracture 2302.60 2302.70 0
2012-10-25 Multi-Stage Fracture 2243.50 2243.60 0
2012-10-25 Multi-Stage Fracture 2184.40 2184.50 0
2012-10-25 Multi-Stage Fracture 2111.70 2111.80 0
2012-10-25 Multi-Stage Fracture 2052.60 2052.70 0
2012-10-24 Multi-Stage Fracture 3102.20 3102.30 0
2012-10-25 Multi-Stage Fracture 1993.80 1993.90 0
2012-10-25 Multi-Stage Fracture 1935.70 1935.80 0
2012-10-25 Open Hole/Barefoot Completion 1636.00 1722.60 0
2012-10-24 Multi-Stage Fracture 3036.30 3036.40 0
2012-10-24 Multi-Stage Fracture 2977.20 2977.30 0
2012-10-24 Multi-Stage Fracture 2918.10 2918.20 0
2012-10-24 Multi-Stage Fracture 2859.10 2859.20 0
2012-10-24 Multi-Stage Fracture 2800.10 2800.20 0
2012-10-24 Multi-Stage Fracture 2740.90 2741.00 0
2012-10-24 Multi-Stage Fracture 2668.30 2668.40 0

For data sources see[6]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-14 No Incident Encountered 0.00 0.00
2012-10-14 No Incident Encountered 0.00 0.00
2012-11-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References