X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885122205002

Well Details

Well ID: 0885122205002
Loading map...
Location: 00/05-22-088-12W5/2
Location Alias: 00/05-22-88-12 W5M
Location Alias 2: 00/05-22-088-12 W5/02
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 12
Section: 22
County/Municipality: Northern Sunrise County
Well Name: MBOG EVI 5-22-88-12
Operator Name: Surge Energy Inc.
License Number: 0431188
License Date: 2011-02-04
License Status: Amended
Spud Date: 2011-11-13
Final Drill Date: 2011-12-08
Well Total Depth: 3207.00 m
Surface Hole Latitude: 56.646338
Surface Hole Longitude: -115.806319

For data sources see[1][2]

Well History

Date Event
2011-02-04 Obtained License
2011-11-16 Surface Casing Operation Performed
2011-11-20 Direction Drilling Operation Performed - Horizontal
2011-11-23 Intermediate Casing Operation Performed
2011-12-03 Direction Drilling Operation Performed - Horizontal
2011-12-08 Finished Drilling
2011-12-08 Well Log Performed
2011-12-08 Well Mode changed to Drilled and Cased
2011-12-11 Liner Casing Operation Performed
2011-12-11 Rig Released
2012-01-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-15 Perforation Treatment Performed - Open-Hole Completion
2012-03-03 Well Began Production
2012-03-03 Well Fluid changed to Crude Oil
2012-03-03 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-20 1191.00 Horizontal
2011-12-03 1688.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-15 Open Hole/Barefoot Completion 3201.70 3207.00 0
2012-01-15 Multi-Stage Fracture 2701.00 2701.10 0
2012-01-15 Multi-Stage Fracture 2642.20 2642.30 0
2012-01-15 Multi-Stage Fracture 2583.40 2583.50 0
2012-01-15 Multi-Stage Fracture 2524.60 2524.70 0
2012-01-15 Multi-Stage Fracture 2083.00 2083.10 0
2012-01-15 Multi-Stage Fracture 3171.70 3171.80 0
2012-01-15 Multi-Stage Fracture 3112.90 3113.00 0
2012-01-15 Multi-Stage Fracture 3054.00 3054.10 0
2012-01-15 Multi-Stage Fracture 2995.20 2995.30 0
2012-01-15 Multi-Stage Fracture 2936.70 2936.80 0
2012-01-15 Multi-Stage Fracture 2877.50 2877.60 0
2012-01-15 Multi-Stage Fracture 2818.60 2818.70 0
2012-01-15 Multi-Stage Fracture 2759.80 2759.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6918 0.0 0.0 0.0
2013 8124 0.0 0.0 0.0
2014 8316 0.0 0.0 0.0
2015 8483 0.0 0.0 0.0
2016 8535 0.0 0.0 0.0
2017 8388 0.0 0.0 0.0
2018 8660 0.0 0.0 0.0
2019 6611 0.0 0.0 0.0
2020 1841 0.0 0.0 0.0

For data sources see[6]

References