X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885122016020

Well Details

Well ID: 0885122016020
Loading map...
Location: 02/16-20-088-12W5/0
Location Alias: 02/16-20-88-12 W5M
Location Alias 2: 02/16-20-088-12 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 12
Section: 20
County/Municipality: Northern Sunrise County
Well Name: LONE PINE OTTER 16-20-88-12
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0437912
License Date: 2011-10-21
License Status: Issued
Spud Date: 2012-01-22
Final Drill Date: 2012-01-28
Well Total Depth: 2125.00 m
Surface Hole Latitude: 56.647457
Surface Hole Longitude: -115.864596

For data sources see[1][2]

Well History

Date Event
2011-10-21 Obtained License
2012-01-23 Surface Casing Operation Performed
2012-01-26 Direction Drilling Operation Performed - Deviate
2012-01-26 Well Log Performed
2012-01-27 Direction Drilling Operation Performed - Horizontal
2012-01-27 Well Log Performed
2012-01-28 Finished Drilling
2012-01-28 Production Casing Operation Performed
2012-01-28 Rig Released
2012-01-28 Well Mode changed to Drilled and Cased
2012-02-03 Well Log Performed
2012-02-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-10 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-15 Well Began Production
2012-03-15 Well Fluid changed to Crude Oil
2012-03-15 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-21 Champion Drilling Inc. 26 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-26 1382.00 Deviate (5 - 79 degrees)
2012-01-27 1677.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-09 Multi-Stage Fracture 1946.70 1947.20 0
2012-02-09 Multi-Stage Fracture 1996.80 1997.30 0
2012-02-09 Multi-Stage Fracture 2046.60 2047.10 0
2012-02-09 Multi-Stage Fracture 2096.50 2097.00 0
2012-02-10 Multi-Stage Fracture 1652.60 1653.10 0
2012-02-10 Multi-Stage Fracture 1747.50 1748.00 0
2012-02-10 Multi-Stage Fracture 1796.90 1797.40 0
2012-02-10 Multi-Stage Fracture 1847.10 1847.60 0
2012-02-10 Multi-Stage Fracture 1897.20 1897.70 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6572 0.0 0.0 0.0
2013 8575 0.0 0.0 0.0
2014 8735 0.0 0.0 0.0
2015 8684 0.0 0.0 0.0
2016 8639 0.0 0.0 0.0
2017 8567 0.0 0.0 0.0
2018 8140 0.0 0.0 0.0
2019 6059 0.0 0.0 0.0

For data sources see[7]

References