X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885121513002

Well Details

Well ID: 0885121513002
Loading map...
Location: 00/13-15-088-12W5/2
Location Alias: 00/13-15-88-12 W5M
Location Alias 2: 00/13-15-088-12 W5/02
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 12
Section: 15
County/Municipality: Northern Sunrise County
Well Name: MBOG EVI 13-15-88-12
Operator Name: Surge Energy Inc.
License Number: 0433842
License Date: 2011-05-27
License Status: Amended
Spud Date: 2012-01-23
Final Drill Date: 2012-02-18
Well Total Depth: 3127.00 m
Surface Hole Latitude: 56.633631
Surface Hole Longitude: -115.810215

For data sources see[1][2]

Well History

Date Event
2011-05-27 Obtained License
2012-01-17 Surface Casing Operation Performed
2012-01-31 Direction Drilling Operation Performed - Horizontal
2012-02-05 Intermediate Casing Operation Performed
2012-02-14 Direction Drilling Operation Performed - Horizontal
2012-02-14 Well Log Performed
2012-02-18 Finished Drilling
2012-02-18 Well Log Performed
2012-02-18 Well Mode changed to Drilled and Cased
2012-02-20 Liner Casing Operation Performed
2012-02-21 Rig Released
2012-03-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-14 Perforation Treatment Performed - Open-Hole Completion
2012-03-28 Well Began Production
2012-03-28 Well Fluid changed to Crude Oil
2012-03-28 Well Mode changed to Pumping
2019-05-31 Well Fluid changed to Crude Oil
2019-05-31 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-01-31 1106.00 Horizontal
2012-02-14 1862.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-14 Open Hole/Barefoot Completion 3098.00 3127.00 0
2012-03-14 Multi-Stage Fracture 2792.60 2792.70 0
2012-03-14 Multi-Stage Fracture 2759.90 2760.00 0
2012-03-14 Multi-Stage Fracture 2733.70 2733.80 0
2012-03-14 Multi-Stage Fracture 2690.10 2690.20 0
2012-03-14 Multi-Stage Fracture 2676.90 2677.00 0
2012-03-14 Multi-Stage Fracture 2632.30 2632.40 0
2012-03-14 Multi-Stage Fracture 2606.10 2606.20 0
2012-03-14 Multi-Stage Fracture 2562.60 2562.70 0
2012-03-14 Multi-Stage Fracture 2549.40 2549.50 0
2012-03-14 Multi-Stage Fracture 2492.00 2492.10 0
2012-03-14 Multi-Stage Fracture 3073.40 3073.50 0
2012-03-14 Multi-Stage Fracture 2433.30 2433.40 0
2012-03-14 Multi-Stage Fracture 2362.40 2362.50 0
2012-03-14 Multi-Stage Fracture 2305.70 2305.80 0
2012-03-14 Multi-Stage Fracture 2236.60 2236.70 0
2012-03-14 Open Hole/Barefoot Completion 1825.00 1875.40 0
2012-03-14 Multi-Stage Fracture 3019.60 3019.70 0
2012-03-14 Multi-Stage Fracture 2991.10 2991.20 0
2012-03-14 Multi-Stage Fracture 2958.30 2958.40 0
2012-03-14 Multi-Stage Fracture 2929.80 2929.90 0
2012-03-14 Multi-Stage Fracture 2882.40 2882.50 0
2012-03-14 Multi-Stage Fracture 2868.00 2868.10 0
2012-03-14 Multi-Stage Fracture 2821.00 2821.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6388 0.0 0.0 0.0
2013 8585 0.0 0.0 0.0
2014 8461 0.0 0.0 0.0
2015 8597 0.0 0.0 0.0
2016 8631 0.0 0.0 0.0
2017 8442 0.0 0.0 0.0
2018 2207 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-21 No Incident Encountered 0.00 0.00

For data sources see[7]

References