X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885121405020

Well Details

Well ID: 0885121405020
Loading map...
Location: 02/05-14-088-12W5/0
Location Alias: 02/05-14-88-12 W5M
Location Alias 2: 02/05-14-088-12 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 12
Section: 14
County/Municipality: Northern Sunrise County
Well Name: PPR 102 EVI 5-14-88-12
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0446816
License Date: 2012-06-26
License Status: Issued
Spud Date: 2012-07-28
Final Drill Date: 2012-08-11
Well Total Depth: 3253.00 m
Surface Hole Latitude: 56.629387
Surface Hole Longitude: -115.777162

For data sources see[1][2]

Well History

Date Event
2012-06-26 Obtained License
2012-07-29 Surface Casing Operation Performed
2012-08-01 Direction Drilling Operation Performed - Horizontal
2012-08-11 Finished Drilling
2012-08-11 Well Mode changed to Drilled and Cased
2012-08-13 Production Casing Operation Performed
2012-08-14 Rig Released
2012-08-29 Well Log Performed
2012-09-25 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-26 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-11 Well Began Production
2012-10-11 Well Fluid changed to Crude Oil
2012-10-11 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-07-28 Precision Drilling Corporation 104 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-01 1094.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-25 Multi-Stage Fracture 3177.00 3177.10 0
2012-09-26 Multi-Stage Fracture 1956.30 1956.40 0
2012-09-26 Multi-Stage Fracture 1882.90 1883.00 0
2012-09-25 Multi-Stage Fracture 2910.00 2910.10 0
2012-09-25 Multi-Stage Fracture 2845.40 2845.50 0
2012-09-25 Multi-Stage Fracture 2767.10 2767.20 0
2012-09-25 Multi-Stage Fracture 2451.00 2451.10 0
2012-09-25 Multi-Stage Fracture 2320.90 2321.00 0
2012-09-25 Multi-Stage Fracture 2244.30 2244.40 0
2012-09-26 Multi-Stage Fracture 2170.90 2171.00 0
2012-09-26 Multi-Stage Fracture 2083.70 2083.80 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1658 0.0 0.0 0.0
2013 522 0.0 0.0 0.0
2014 2937 0.0 0.0 0.0
2015 8530 0.0 0.0 0.0
2016 8160 0.0 0.0 0.0
2017 8084 0.0 0.0 0.0
2018 8379 0.0 0.0 0.0
2019 1440 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-14 No Incident Encountered 0.00 0.00
2012-09-30 No Incident Encountered 0.00 0.00

For data sources see[8]

References