X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885121304030

Well Details

Well ID: 0885121304030
Loading map...
Location: 03/04-13-088-12W5/0
Location Alias: 03/04-13-88-12 W5M
Location Alias 2: 03/04-13-088-12 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 12
Section: 13
County/Municipality: Northern Sunrise County
Well Name: MBOG EVI 4-13-88-12
Operator Name: Surge Energy Inc.
License Number: 0439463
License Date: 2011-11-23
License Status: Amended
Spud Date: 2012-02-24
Final Drill Date: 2012-03-09
Well Total Depth: 3551.00 m
Surface Hole Latitude: 56.631691
Surface Hole Longitude: -115.753100

For data sources see[1][2]

Well History

Date Event
2011-03-03 Well Log Performed
2011-11-23 Obtained License
2012-02-26 Surface Casing Operation Performed
2012-02-29 Direction Drilling Operation Performed - Deviate
2012-03-01 Direction Drilling Operation Performed - Horizontal
2012-03-01 Well Log Performed
2012-03-03 Intermediate Casing Operation Performed
2012-03-09 Finished Drilling
2012-03-09 Well Log Performed
2012-03-09 Well Structure changed to Drain
2012-03-10 Well Log Performed
2012-03-12 Liner Casing Operation Performed
2012-03-27 Rig Released
2012-05-12 Well Log Performed
2012-06-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-06-13 Perforation Treatment Performed - Open-Hole Completion
2012-06-14 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-24 Bonanza Drilling Inc. 4 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-29 1253.00 Deviate (5 - 79 degrees)
2012-03-01 1621.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-06-13 Open Hole/Barefoot Completion 3547.00 3551.00 0
2012-06-13 Multi-Stage Fracture 2842.50 2872.60 0
2012-06-13 Multi-Stage Fracture 2800.60 2800.70 0
2012-06-13 Multi-Stage Fracture 2714.70 2714.80 0
2012-06-13 Multi-Stage Fracture 2642.20 2642.30 0
2012-06-13 Multi-Stage Fracture 2569.60 2569.70 0
2012-06-13 Multi-Stage Fracture 2484.30 2484.40 0
2012-06-14 Multi-Stage Fracture 2411.70 2411.80 0
2012-06-14 Multi-Stage Fracture 2326.00 2326.10 0
2012-06-14 Multi-Stage Fracture 2243.00 2243.10 0
2012-06-14 Multi-Stage Fracture 2171.50 2171.60 0
2012-06-13 Multi-Stage Fracture 3512.80 3512.90 0
2012-06-14 Multi-Stage Fracture 2087.40 2087.50 0
2012-06-14 Multi-Stage Fracture 2003.00 2003.10 0
2012-06-13 Multi-Stage Fracture 3436.00 3436.10 0
2012-06-13 Multi-Stage Fracture 3351.60 3351.70 0
2012-06-13 Multi-Stage Fracture 3267.10 3267.20 0
2012-06-13 Multi-Stage Fracture 3196.30 3196.40 0
2012-06-13 Multi-Stage Fracture 3112.90 3113.00 0
2012-06-13 Multi-Stage Fracture 3041.00 3041.10 0
2012-06-13 Multi-Stage Fracture 2956.00 2956.10 0

For data sources see[6]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-27 No Incident Encountered 0.00 0.00
2012-06-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References