If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0885121113020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.616973,"lon":-115.779595,"icon":""}]} |
Location: 02/13-11-088-12W5/0 | |
Location Alias: 02/13-11-88-12 W5M | |
Location Alias 2: 02/13-11-088-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 088 | |
Meridian: 5 | |
Range: 12 | |
Section: 11 | |
County/Municipality: Northern Sunrise County | |
Well Name: MBOG EVI 13-11-88-12 | |
Operator Name: Surge Energy Inc. | |
License Number: 0439494 | |
License Date: 2011-11-23 | |
License Status: Amended | |
Spud Date: 2012-05-21 | |
Final Drill Date: 2012-06-03 | |
Well Total Depth: 3124.00 m | |
Surface Hole Latitude: 56.616973 | |
Surface Hole Longitude: -115.779595 |
Date | Event |
---|---|
2011-11-23 | Obtained License |
2012-05-23 | Surface Casing Operation Performed |
2012-05-25 | Well Log Performed |
2012-05-26 | Direction Drilling Operation Performed - Deviate |
2012-05-27 | Direction Drilling Operation Performed - Horizontal |
2012-05-29 | Intermediate Casing Operation Performed |
2012-05-29 | Well Log Performed |
2012-06-03 | Finished Drilling |
2012-06-03 | Well Structure changed to Drain |
2012-06-05 | Liner Casing Operation Performed |
2012-06-06 | Well Log Performed |
2012-06-16 | Rig Released |
2012-07-16 | Well Log Performed |
2012-08-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-17 | Perforation Treatment Performed - Open-Hole Completion |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-05-21 | Bonanza Drilling Inc. | 4 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-05-26 | 1244.00 | Deviate (5 - 79 degrees) |
2012-05-27 | 1673.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-08-17 | Open Hole/Barefoot Completion | 3114.00 | 3124.00 | 0 |
2012-08-17 | Multi-Stage Fracture | 2827.40 | 2827.50 | 0 |
2012-08-17 | Multi-Stage Fracture | 2781.20 | 2781.30 | 0 |
2012-08-17 | Multi-Stage Fracture | 2754.00 | 2754.10 | 0 |
2012-08-17 | Multi-Stage Fracture | 2708.90 | 2709.00 | 0 |
2012-08-17 | Multi-Stage Fracture | 2695.10 | 2695.20 | 0 |
2012-08-17 | Multi-Stage Fracture | 2649.00 | 2649.10 | 0 |
2012-08-17 | Multi-Stage Fracture | 2621.70 | 2621.80 | 0 |
2012-08-17 | Multi-Stage Fracture | 2590.00 | 2590.10 | 0 |
2012-08-17 | Multi-Stage Fracture | 2562.60 | 2562.70 | 0 |
2012-08-17 | Multi-Stage Fracture | 2516.30 | 2516.40 | 0 |
2012-08-17 | Multi-Stage Fracture | 3095.10 | 3095.20 | 0 |
2012-08-17 | Multi-Stage Fracture | 2502.50 | 2502.60 | 0 |
2012-08-17 | Multi-Stage Fracture | 2457.30 | 2457.40 | 0 |
2012-08-17 | Multi-Stage Fracture | 2430.50 | 2430.60 | 0 |
2012-08-17 | Multi-Stage Fracture | 2384.20 | 2384.30 | 0 |
2012-08-17 | Multi-Stage Fracture | 2370.40 | 2370.50 | 0 |
2012-08-17 | Multi-Stage Fracture | 2325.20 | 2325.30 | 0 |
2012-08-17 | Multi-Stage Fracture | 2297.80 | 2297.90 | 0 |
2012-08-17 | Multi-Stage Fracture | 2265.10 | 2265.20 | 0 |
2012-08-17 | Multi-Stage Fracture | 2238.80 | 2238.90 | 0 |
2012-08-17 | Multi-Stage Fracture | 2193.50 | 2193.60 | 0 |
2012-08-17 | Multi-Stage Fracture | 3042.30 | 3042.40 | 0 |
2012-08-17 | Multi-Stage Fracture | 2166.20 | 2166.30 | 0 |
2012-08-17 | Multi-Stage Fracture | 2119.90 | 2120.00 | 0 |
2012-08-17 | Open Hole/Barefoot Completion | 1689.70 | 1763.30 | 0 |
2012-08-17 | Multi-Stage Fracture | 3018.60 | 3018.70 | 0 |
2012-08-17 | Multi-Stage Fracture | 2974.20 | 2974.30 | 0 |
2012-08-17 | Multi-Stage Fracture | 2953.60 | 2953.70 | 0 |
2012-08-17 | Multi-Stage Fracture | 2907.20 | 2907.30 | 0 |
2012-08-17 | Multi-Stage Fracture | 2885.90 | 2886.00 | 0 |
2012-08-17 | Multi-Stage Fracture | 2841.10 | 2841.20 | 0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-06-16 | No Incident Encountered | 0.00 | 0.00 |
2012-09-12 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]