X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885110616022

Well Details

Well ID: 0885110616022
Loading map...
Location: 02/16-06-088-11W5/2
Location Alias: 02/16-06-88-11 W5M
Location Alias 2: 02/16-06-088-11 W5/02
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 11
Section: 06
County/Municipality: Northern Sunrise County
Well Name: MBOG EVI 16-6-88-11
Operator Name: Surge Energy Inc.
License Number: 0422313
License Date: 2010-07-30
License Status: Issued
Spud Date: 2011-03-23
Final Drill Date: 2011-08-02
Well Total Depth: 3417.00 m
Surface Hole Latitude: 56.602142
Surface Hole Longitude: -115.761724

For data sources see[1][2]

Well History

Date Event
2010-07-30 Obtained License
2011-03-24 Surface Casing Operation Performed
2011-07-05 Direction Drilling Operation Performed - Horizontal
2011-07-10 Intermediate Casing Operation Performed
2011-07-25 Direction Drilling Operation Performed - Horizontal
2011-08-02 Finished Drilling
2011-08-02 Well Log Performed
2011-08-02 Well Mode changed to Drilled and Cased
2011-08-04 Liner Casing Operation Performed
2011-08-05 Rig Released
2011-10-06 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-06 Perforation Treatment Performed - Open-Hole Completion
2011-10-07 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-22 Well Began Production
2011-10-22 Well Fluid changed to Crude Oil
2011-10-22 Well Mode changed to Pumping
2014-11-15 Well Began Injection
2014-11-15 Well Fluid changed to Water
2014-11-15 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-05 722.20 Horizontal
2011-07-25 1669.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-06 Open Hole/Barefoot Completion 3413.00 3417.00 0
2011-10-06 Multi-Stage Fracture 2795.20 2795.60 0
2011-10-07 Multi-Stage Fracture 2721.50 2721.90 0
2011-10-07 Multi-Stage Fracture 2647.70 2648.10 0
2011-10-07 Multi-Stage Fracture 2574.00 2574.40 0
2011-10-07 Multi-Stage Fracture 2500.20 2500.60 0
2011-10-07 Multi-Stage Fracture 2426.40 2426.80 0
2011-10-07 Multi-Stage Fracture 2352.60 2353.00 0
2011-10-07 Multi-Stage Fracture 2278.90 2279.30 0
2011-10-07 Multi-Stage Fracture 2205.10 2205.50 0
2011-10-07 Multi-Stage Fracture 2131.30 2131.70 0
2011-10-06 Multi-Stage Fracture 3377.00 3377.40 0
2011-10-07 Multi-Stage Fracture 2057.50 2057.90 0
2011-10-07 Multi-Stage Fracture 1983.80 1984.20 0
2011-10-06 Multi-Stage Fracture 3311.60 3312.00 0
2011-10-06 Multi-Stage Fracture 3237.80 3238.20 0
2011-10-06 Multi-Stage Fracture 3164.10 3164.50 0
2011-10-06 Multi-Stage Fracture 3090.30 3090.70 0
2011-10-06 Multi-Stage Fracture 3016.50 3016.90 0
2011-10-06 Multi-Stage Fracture 2942.70 2943.10 0
2011-10-06 Multi-Stage Fracture 2869.00 2869.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 768 0.0 0.0 0.0
2012 5960 0.0 0.0 0.0
2013 8132 0.0 0.0 0.0
2014 1632 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-07-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References