X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885091602000

Well Details

Well ID: 0885091602000
Loading map...
Location: 00/02-16-088-09W5/0
Location Alias: 00/02-16-88-09 W5M
Location Alias 2: 00/02-16-088-09 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 09
Section: 16
County/Municipality: Municipal District of Opportunity No. 17
Well Name: AMOCO REDEARTH 2-16-88-9
Operator Name: BP Canada Energy Group ULC
License Number: 0031756
License Date: 1967-02-14
License Status: RecCertified
Spud Date: 1967-02-16
Final Drill Date: 1967-03-07
Well Total Depth: 1463.00 m
Surface Hole Latitude: 56.626550
Surface Hole Longitude: -115.367693

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-02-14 Obtained License
1967-03-01 Drill Stem Test Performed
1967-03-02 Drill Stem Test Performed
1967-03-06 Drill Stem Test Performed
1967-03-07 Finished Drilling
1967-03-07 Well Mode changed to Drilled and Cased
1967-03-08 Production Casing Operation Performed
1967-03-16 Perforation Treatment Performed - Bullet Perforation
1967-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-03-17 Perforation Treatment Performed - Bullet Perforation
1967-03-20 Well Began Production
1967-03-20 Well Fluid changed to Crude Oil
1967-03-20 Well Mode changed to Flowing
1967-04-06 Perforation Treatment Performed - Bullet Perforation
1967-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-04-16 Well Fluid changed to Crude Oil
1968-04-16 Well Mode changed to Suspended
1980-08-15 Perforation Treatment Performed - Jet Perforation
1980-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-17 Perforation Treatment Performed - Cement Squeeze
1980-08-20 Perforation Treatment Performed - Jet Perforation
1980-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-04-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-04-10 Plug Back Performed
1989-04-10 Well Abandoned
1989-04-10 Well Fluid changed to Crude Oil
1989-04-10 Well Log Performed
1989-04-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-03-16 Bullet Perforation 1438.40 1439.60 3
1980-08-20 Perforation 1432.00 1433.80 13
1980-08-20 Perforation 1438.00 1439.90 13
1980-08-28 Acid Treatment 1432.00 1439.90 0
1989-04-10 Packing Device Capped w/Cement 1417.00 1425.00 0
1967-03-17 Acid Treatment 1438.40 1439.60 0
1967-03-17 Bullet Perforation 1438.40 1439.60 10
1967-03-17 Bullet Perforation 1440.50 1441.40 10
1967-04-06 Bullet Perforation 1432.60 1434.10 13
1967-04-07 Acid Treatment 1432.60 1434.10 0
1980-08-15 Perforation 1447.20 1447.50 5
1980-08-17 Acid Treatment 1432.60 1447.50 0
1980-08-17 Cement Squeeze 1432.60 1447.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0

For data sources see[5]

References