If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0885091213000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.621281,"lon":-115.298291,"icon":""}]} |
Location: 00/13-12-088-09W5/0 | |
Location Alias: 00/13-12-88-09 W5M | |
Location Alias 2: 00/13-12-088-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 088 | |
Meridian: 5 | |
Range: 09 | |
Section: 12 | |
County/Municipality: Municipal District of Opportunity No. 17 | |
Well Name: MBOG REDEARTH 13-12-88-9 | |
Operator Name: Surge Energy Inc. | |
License Number: 0118615 | |
License Date: 1985-10-25 | |
License Status: Suspension | |
Spud Date: 1985-10-29 | |
Final Drill Date: 1985-11-08 | |
Well Total Depth: 1503.00 m | |
Surface Hole Latitude: 56.621281 | |
Surface Hole Longitude: -115.298291 |
Date | Event |
---|---|
1985-10-25 | Obtained License |
1985-10-30 | Water Flow Occurred |
1985-10-31 | Surface Casing Operation Performed |
1985-11-08 | Finished Drilling |
1985-11-08 | Well Log Performed |
1985-11-08 | Well Mode changed to Drilled and Cased |
1985-11-09 | Production Casing Operation Performed |
1985-11-10 | Rig Released |
1985-11-19 | Well Log Performed |
1985-11-20 | Perforation Treatment Performed - Jet Perforation |
1985-11-23 | Perforation Treatment Performed - Fractured |
1985-12-02 | Well Began Production |
1985-12-02 | Well Fluid changed to Crude Oil |
1985-12-02 | Well Mode changed to Pumping |
1989-03-10 | Well Fluid changed to Crude Oil |
1989-03-10 | Well Mode changed to Suspended |
2010-04-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-04-10 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-11-20 | Perforation | 1411.00 | 1414.00 | 13 |
1985-11-20 | Perforation | 1416.70 | 1417.70 | 13 |
1985-11-20 | Perforation | 1418.30 | 1419.30 | 13 |
1985-11-23 | Fracture | 1411.00 | 1419.30 | 0 |
2010-04-10 | Packing Device Capped w/Cement | 1395.00 | 1403.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 744 | 0.0 | 0.0 | 0.0 |
1986 | 5971 | 0.0 | 0.0 | 0.0 |
1987 | 8424 | 0.0 | 0.0 | 0.0 |
1988 | 8211 | 0.0 | 0.0 | 0.0 |
1989 | 168 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1985-10-30 | Water Flow | 305.00 | 305.00 |
For data sources see[6]