X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885091204002

Well Details

Well ID: 0885091204002
Loading map...
Location: 00/04-12-088-09W5/2
Location Alias: 00/04-12-88-09 W5M
Location Alias 2: 00/04-12-088-09 W5/02
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 09
Section: 12
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 4-12-88-9
Operator Name: Surge Energy Inc.
License Number: 0067541
License Date: 1977-12-20
License Status: Issued
Spud Date: 1978-09-26
Final Drill Date: 1978-10-11
Well Total Depth: 1437.00 m
Surface Hole Latitude: 56.612798
Surface Hole Longitude: -115.299523

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-12-20 Obtained License
1978-10-11 Finished Drilling
1978-10-11 Well Mode changed to Drilled and Cased
1978-10-13 Drill Stem Test Performed
1978-10-15 Production Casing Operation Performed
1978-11-25 Perforation Treatment Performed - Jet Perforation
1978-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-12-18 Perforation Treatment Performed - Jet Perforation
1990-12-18 Plug Back Performed
1990-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-01-04 Well Began Production
1991-01-04 Well Fluid changed to Crude Oil
1991-01-04 Well Mode changed to Pumping
1998-10-01 Well Fluid changed to Crude Oil
1998-10-01 Well Mode changed to Suspended
2003-03-15 Well Log Performed
2003-11-19 Perforation Treatment Performed - Fractured
2003-11-28 Well Fluid changed to Crude Oil
2003-11-28 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-11-25 Perforation 1412.70 1416.20 7
1978-11-25 Perforation 1417.90 1418.40 13
1978-11-25 Perforation 1409.70 1410.20 13
1978-11-26 Acid Treatment 1409.70 1418.40 0
1990-12-18 Packing Device Capped w/Cement 1397.00 1405.00 0
1990-12-18 Perforation 1284.00 1288.00 13
1990-12-19 Acid Treatment 1284.00 1288.00 0
2003-11-19 Fracture 1284.00 1288.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 8354 0.0 0.0 0.0
1992 8604 0.0 0.0 0.0
1993 8428 0.0 0.0 0.0
1994 8567 0.0 0.0 0.0
1995 8679 0.0 0.0 0.0
1996 7561 0.0 0.0 0.0
2003 774 0.0 0.0 0.0
2004 8474 0.0 0.0 0.0
2005 8589 0.0 0.0 0.0
2006 8452 0.0 0.0 0.0
2007 8051 0.0 0.0 0.0
2008 8082 0.0 0.0 0.0
2009 7910 0.0 0.0 0.0
2010 8015 0.0 0.0 0.0
2011 7691 0.0 0.0 0.0
2012 8675 0.0 0.0 0.0
2013 8303 0.0 0.0 0.0
2014 8519 0.0 0.0 0.0
2015 8736 0.0 0.0 0.0
2016 8759 0.0 0.0 0.0
2017 8625 0.0 0.0 0.0
2018 8735 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References