If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0885091204000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.612798,"lon":-115.299523,"icon":""}]} |
Location: 00/04-12-088-09W5/0 | |
Location Alias: 00/04-12-88-09 W5M | |
Location Alias 2: 00/04-12-088-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 088 | |
Meridian: 5 | |
Range: 09 | |
Section: 12 | |
County/Municipality: Municipal District of Opportunity No. 17 | |
Well Name: MBOG REDEARTH 4-12-88-9 | |
Operator Name: Surge Energy Inc. | |
License Number: 0067541 | |
License Date: 1977-12-20 | |
License Status: Issued | |
Spud Date: 1978-09-26 | |
Final Drill Date: 1978-10-11 | |
Well Total Depth: 1437.00 m | |
Surface Hole Latitude: 56.612798 | |
Surface Hole Longitude: -115.299523 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1977-12-20 | Obtained License |
1978-10-11 | Finished Drilling |
1978-10-11 | Well Mode changed to Drilled and Cased |
1978-10-13 | Drill Stem Test Performed |
1978-10-15 | Production Casing Operation Performed |
1978-11-25 | Perforation Treatment Performed - Jet Perforation |
1978-11-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-12-01 | Well Began Production |
1978-12-01 | Well Fluid changed to Crude Oil |
1978-12-01 | Well Mode changed to Pumping |
1989-12-31 | Well Fluid changed to Crude Oil |
1989-12-31 | Well Mode changed to Suspended |
1990-12-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-12-18 | Perforation Treatment Performed - Jet Perforation |
1990-12-18 | Plug Back Performed |
1990-12-18 | Well Fluid changed to Crude Oil |
1990-12-18 | Well Mode changed to Abandoned Zone |
1990-12-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2003-03-15 | Well Log Performed |
2003-11-19 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1978-11-25 | Perforation | 1412.70 | 1416.20 | 7 |
1978-11-25 | Perforation | 1417.90 | 1418.40 | 13 |
1978-11-25 | Perforation | 1409.70 | 1410.20 | 13 |
1978-11-26 | Acid Treatment | 1409.70 | 1418.40 | 0 |
1990-12-18 | Packing Device Capped w/Cement | 1397.00 | 1405.00 | 0 |
1990-12-18 | Perforation | 1284.00 | 1288.00 | 13 |
1990-12-19 | Acid Treatment | 1284.00 | 1288.00 | 0 |
2003-11-19 | Fracture | 1284.00 | 1288.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1978 | 690 | 0.0 | 0.0 | 0.0 |
1979 | 6853 | 0.0 | 0.0 | 0.0 |
1980 | 8454 | 0.0 | 0.0 | 0.0 |
1981 | 7644 | 0.0 | 0.0 | 0.0 |
1982 | 7292 | 0.0 | 0.0 | 0.0 |
1983 | 7801 | 0.0 | 0.0 | 0.0 |
1984 | 8180 | 0.0 | 0.0 | 0.0 |
1985 | 8103 | 0.0 | 0.0 | 0.0 |
1986 | 6076 | 0.0 | 0.0 | 0.0 |
1987 | 7219 | 0.0 | 0.0 | 0.0 |
1988 | 4860 | 0.0 | 0.0 | 0.0 |
For data sources see[5]