X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885091108002

Well Details

Well ID: 0885091108002
Loading map...
Location: 00/08-11-088-09W5/2
Location Alias: 00/08-11-88-09 W5M
Location Alias 2: 00/08-11-088-09 W5/02
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 09
Section: 11
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 8-11-88-9
Operator Name: Surge Energy Inc.
License Number: 0213426
License Date: 1998-02-13
License Status: Suspension
Spud Date: 1998-03-08
Final Drill Date: 1998-03-18
Well Total Depth: 1444.00 m
Surface Hole Latitude: 56.616034
Surface Hole Longitude: -115.307755

For data sources see[1][2]

Well History

Date Event
1998-02-13 Obtained License
1998-03-08 Lost Circulation Occurred
1998-03-11 Surface Casing Operation Performed
1998-03-18 Finished Drilling
1998-03-18 Well Mode changed to Drilled and Cased
1998-03-19 Drill Stem Test Performed
1998-03-19 Well Log Performed
1998-03-20 Drill Stem Test Performed
1998-03-22 Production Casing Operation Performed
1998-03-22 Rig Released
1998-03-28 Well Log Performed
1998-03-29 Perforation Treatment Performed - Jet Perforation
1998-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-04-04 Perforation Treatment Performed - Jet Perforation
1998-04-04 Well Log Performed
1998-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-20 Plug Back Performed
2000-02-22 Perforation Treatment Performed - Jet Perforation
2000-02-22 Well Log Performed
2000-02-22 Well Mode changed to Drilled and Cased
2000-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-04-14 Well Began Production
2000-04-14 Well Fluid changed to Crude Oil
2000-04-14 Well Mode changed to Pumping
2009-03-04 Perforation Treatment Performed - Jet Perforation
2015-03-01 Well Fluid changed to Crude Oil
2015-03-01 Well Mode changed to Suspended
2016-12-18 Well Fluid changed to Crude Oil
2016-12-18 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-03-29 Perforation 1405.00 1407.50 17
1998-04-02 Acid Treatment 1405.00 1407.50 0
1998-04-04 Perforation 1407.00 1414.00 17
1998-04-06 Acid Treatment 1405.00 1414.00 0
2000-02-20 Packing Device Capped w/Cement 1392.00 1400.00 0
2000-02-22 Perforation 1278.00 1282.00 17
2000-02-23 Acid Treatment 1278.00 1282.00 0
2009-03-04 Perforation 1262.00 1267.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 5814 0.0 0.0 0.0
2001 5869 0.0 0.0 0.0
2002 6857 0.0 0.0 0.0
2003 8681 0.0 0.0 0.0
2004 8143 0.0 0.0 0.0
2005 8623 0.0 0.0 0.0
2006 8723 0.0 0.0 0.0
2007 8599 0.0 0.0 0.0
2008 7545 0.0 0.0 0.0
2009 6220 0.0 0.0 0.0
2010 8372 0.0 0.0 0.0
2011 8129 0.0 0.0 0.0
2012 8735 0.0 0.0 0.0
2013 7895 0.0 0.0 0.0
2016 360 0.0 0.0 0.0
2017 8615 0.0 0.0 0.0
2018 7334 0.0 0.0 0.0
2019 7116 0.0 0.0 0.0
2020 2081 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1998-03-08 Lost Circulation 177.00 177.00

For data sources see[6]

References