X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885091108000

Well Details

Well ID: 0885091108000
Loading map...
Location: 00/08-11-088-09W5/0
Location Alias: 00/08-11-88-09 W5M
Location Alias 2: 00/08-11-088-09 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 09
Section: 11
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 8-11-88-9
Operator Name: Surge Energy Inc.
License Number: 0213426
License Date: 1998-02-13
License Status: Suspension
Spud Date: 1998-03-08
Final Drill Date: 1998-03-18
Well Total Depth: 1444.00 m
Surface Hole Latitude: 56.616034
Surface Hole Longitude: -115.307755

For data sources see[1][2]

Well History

Date Event
1998-02-13 Obtained License
1998-03-08 Lost Circulation Occurred
1998-03-11 Surface Casing Operation Performed
1998-03-18 Finished Drilling
1998-03-18 Well Mode changed to Drilled and Cased
1998-03-19 Drill Stem Test Performed
1998-03-19 Well Log Performed
1998-03-20 Drill Stem Test Performed
1998-03-22 Production Casing Operation Performed
1998-03-22 Rig Released
1998-03-28 Well Log Performed
1998-03-29 Perforation Treatment Performed - Jet Perforation
1998-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-04-04 Perforation Treatment Performed - Jet Perforation
1998-04-04 Well Log Performed
1998-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-05-20 Well Began Production
1998-05-20 Well Fluid changed to Crude Oil
1998-05-20 Well Mode changed to Pumping
2000-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-20 Plug Back Performed
2000-02-20 Well Fluid changed to Crude Oil
2000-02-20 Well Mode changed to Abandoned Zone
2000-02-22 Perforation Treatment Performed - Jet Perforation
2000-02-22 Well Log Performed
2000-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-03-04 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-03-29 Perforation 1405.00 1407.50 17
1998-04-02 Acid Treatment 1405.00 1407.50 0
1998-04-04 Perforation 1407.00 1414.00 17
1998-04-06 Acid Treatment 1405.00 1414.00 0
2000-02-20 Packing Device Capped w/Cement 1392.00 1400.00 0
2000-02-22 Perforation 1278.00 1282.00 17
2000-02-23 Acid Treatment 1278.00 1282.00 0
2009-03-04 Perforation 1262.00 1267.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 4827 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1998-03-08 Lost Circulation 177.00 177.00

For data sources see[6]

References