X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885090202000

Well Details

Well ID: 0885090202000
Loading map...
Location: 00/02-02-088-09W5/0
Location Alias: 00/02-02-88-09 W5M
Location Alias 2: 00/02-02-088-09 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 09
Section: 02
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 2-2-88-9
Operator Name: Surge Energy Inc.
License Number: 0121732
License Date: 1986-01-24
License Status: Suspension
Spud Date: 1986-01-28
Final Drill Date: 1986-02-06
Well Total Depth: 1472.00 m
Surface Hole Latitude: 56.597442
Surface Hole Longitude: -115.313194

For data sources see[1][2]

Well History

Date Event
1986-01-24 Obtained License
1986-01-30 Surface Casing Operation Performed
1986-02-06 Finished Drilling
1986-02-06 Well Log Performed
1986-02-06 Well Mode changed to Drilled and Cased
1986-02-07 Well Log Performed
1986-02-08 Production Casing Operation Performed
1986-02-08 Rig Released
1986-02-25 Perforation Treatment Performed - Jet Perforation
1986-02-26 Perforation Treatment Performed - Acid Wash - No Pressure
1986-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-03-19 Plug Back Performed
1986-03-19 Well Log Performed
1986-03-20 Perforation Treatment Performed - Jet Perforation
1986-03-20 Well Log Performed
1986-03-21 Perforation Treatment Performed - Fractured
1986-04-10 Well Began Production
1986-04-10 Well Fluid changed to Crude Oil
1986-04-10 Well Mode changed to Pumping
1998-03-01 Well Fluid changed to Crude Oil
1998-03-01 Well Mode changed to Suspended
2003-03-02 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-02-25 Perforation 1424.00 1426.00 13
1986-02-26 Acid Wash 1424.00 1426.00 0
1986-02-28 Acid Treatment 1424.00 1426.00 0
1986-03-19 Packing Device Capped w/Cement 1408.00 1417.00 0
1986-03-20 Perforation 1281.00 1290.00 14
1986-03-20 Perforation 1291.50 1293.00 14
1986-03-20 Perforation 1295.00 1296.50 14
1986-03-20 Perforation 1300.00 1304.00 14
1986-03-21 Fracture 1281.00 1304.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 4479 0.0 0.0 0.0
1987 6396 0.0 0.0 0.0
1988 3294 0.0 0.0 0.0
1989 6247 0.0 0.0 0.0
1990 4658 0.0 0.0 0.0
1991 8466 0.0 0.0 0.0
1992 7687 0.0 0.0 0.0
1993 6373 0.0 0.0 0.0
1994 8167 0.0 0.0 0.0
1995 5410 0.0 0.0 0.0

For data sources see[5]

References