X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885090103002

Well Details

Well ID: 0885090103002
Loading map...
Location: 00/03-01-088-09W5/2
Location Alias: 00/03-01-88-09 W5M
Location Alias 2: 00/03-01-088-09 W5/02
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 09
Section: 01
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 3-1-88-9
Operator Name: Surge Energy Inc.
License Number: 0044672
License Date: 1972-12-29
License Status: Suspension
Spud Date: 1973-01-05
Final Drill Date: 1973-01-20
Well Total Depth: 1449.00 m
Surface Hole Latitude: 56.597930
Surface Hole Longitude: -115.295038

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-12-29 Obtained License
1973-01-20 Finished Drilling
1973-01-20 Well Mode changed to Drilled and Cased
1973-01-21 Drill Stem Test Performed
1973-01-22 Production Casing Operation Performed
1973-01-28 Perforation Treatment Performed - Jet Perforation
1998-03-15 Perforation Treatment Performed - Jet Perforation
1998-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-03 Plug Back Performed
1999-11-20 Well Began Production
1999-11-20 Well Fluid changed to Crude Oil
1999-11-20 Well Mode changed to Pumping
2002-06-01 Well Fluid changed to Crude Oil
2002-06-01 Well Mode changed to Suspended
2010-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-01-28 Perforation 1417.90 1418.50 7
1973-01-28 Perforation 1422.80 1424.30 7
1973-01-28 Perforation 1425.20 1426.20 7
1998-03-15 Perforation 1295.10 1297.10 14
1998-03-15 Perforation 1297.50 1298.80 14
1998-03-16 Acid Treatment 1295.10 1298.80 0
1999-11-03 Packing Device Capped w/Cement 1403.00 1411.00 0
2010-02-27 Packing Device Capped w/Cement 1277.00 1285.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 744 0.0 0.0 0.0

For data sources see[5]

References