If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0885090103002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.59793,"lon":-115.295038,"icon":""}]} |
Location: 00/03-01-088-09W5/2 | |
Location Alias: 00/03-01-88-09 W5M | |
Location Alias 2: 00/03-01-088-09 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 088 | |
Meridian: 5 | |
Range: 09 | |
Section: 01 | |
County/Municipality: Municipal District of Opportunity No. 17 | |
Well Name: MBOG REDEARTH 3-1-88-9 | |
Operator Name: Surge Energy Inc. | |
License Number: 0044672 | |
License Date: 1972-12-29 | |
License Status: Suspension | |
Spud Date: 1973-01-05 | |
Final Drill Date: 1973-01-20 | |
Well Total Depth: 1449.00 m | |
Surface Hole Latitude: 56.597930 | |
Surface Hole Longitude: -115.295038 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1972-12-29 | Obtained License |
1973-01-20 | Finished Drilling |
1973-01-20 | Well Mode changed to Drilled and Cased |
1973-01-21 | Drill Stem Test Performed |
1973-01-22 | Production Casing Operation Performed |
1973-01-28 | Perforation Treatment Performed - Jet Perforation |
1998-03-15 | Perforation Treatment Performed - Jet Perforation |
1998-03-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-11-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-11-03 | Plug Back Performed |
1999-11-20 | Well Began Production |
1999-11-20 | Well Fluid changed to Crude Oil |
1999-11-20 | Well Mode changed to Pumping |
2002-06-01 | Well Fluid changed to Crude Oil |
2002-06-01 | Well Mode changed to Suspended |
2010-02-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1973-01-28 | Perforation | 1417.90 | 1418.50 | 7 |
1973-01-28 | Perforation | 1422.80 | 1424.30 | 7 |
1973-01-28 | Perforation | 1425.20 | 1426.20 | 7 |
1998-03-15 | Perforation | 1295.10 | 1297.10 | 14 |
1998-03-15 | Perforation | 1297.50 | 1298.80 | 14 |
1998-03-16 | Acid Treatment | 1295.10 | 1298.80 | 0 |
1999-11-03 | Packing Device Capped w/Cement | 1403.00 | 1411.00 | 0 |
2010-02-27 | Packing Device Capped w/Cement | 1277.00 | 1285.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 744 | 0.0 | 0.0 | 0.0 |
For data sources see[5]