X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885090103000

Well Details

Well ID: 0885090103000
Loading map...
Location: 00/03-01-088-09W5/0
Location Alias: 00/03-01-88-09 W5M
Location Alias 2: 00/03-01-088-09 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 09
Section: 01
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 3-1-88-9
Operator Name: Surge Energy Inc.
License Number: 0044672
License Date: 1972-12-29
License Status: Suspension
Spud Date: 1973-01-05
Final Drill Date: 1973-01-20
Well Total Depth: 1449.00 m
Surface Hole Latitude: 56.597930
Surface Hole Longitude: -115.295038

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-12-29 Obtained License
1973-01-20 Finished Drilling
1973-01-20 Well Mode changed to Drilled and Cased
1973-01-21 Drill Stem Test Performed
1973-01-22 Production Casing Operation Performed
1973-01-28 Perforation Treatment Performed - Jet Perforation
1973-01-29 Well Began Production
1973-01-29 Well Fluid changed to Crude Oil
1973-01-29 Well Mode changed to Flowing
1975-05-28 Well Fluid changed to Crude Oil
1975-05-28 Well Mode changed to Pumping
1998-03-15 Perforation Treatment Performed - Jet Perforation
1998-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-03 Plug Back Performed
1999-11-03 Well Fluid changed to Crude Oil
1999-11-03 Well Mode changed to Abandoned Zone
2010-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-01-28 Perforation 1417.90 1418.50 7
1973-01-28 Perforation 1422.80 1424.30 7
1973-01-28 Perforation 1425.20 1426.20 7
1998-03-15 Perforation 1295.10 1297.10 14
1998-03-15 Perforation 1297.50 1298.80 14
1998-03-16 Acid Treatment 1295.10 1298.80 0
1999-11-03 Packing Device Capped w/Cement 1403.00 1411.00 0
2010-02-27 Packing Device Capped w/Cement 1277.00 1285.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 7120 0.0 0.0 0.0
1974 8492 0.0 0.0 0.0
1975 8077 0.0 0.0 0.0
1976 7442 0.0 0.0 0.0
1977 7588 0.0 0.0 0.0
1978 7127 0.0 0.0 0.0
1979 8592 0.0 0.0 0.0
1980 7779 0.0 0.0 0.0
1981 7758 0.0 0.0 0.0
1982 7691 0.0 0.0 0.0
1983 8335 0.0 0.0 0.0
1984 8347 0.0 0.0 0.0
1985 8441 0.0 0.0 0.0
1986 6909 0.0 0.0 0.0
1987 8355 0.0 0.0 0.0
1988 7916 0.0 0.0 0.0
1989 8404 0.0 0.0 0.0
1990 8656 0.0 0.0 0.0
1991 8101 0.0 0.0 0.0
1992 7912 0.0 0.0 0.0
1993 7642 0.0 0.0 0.0
1994 7388 0.0 0.0 0.0
1995 6990 0.0 0.0 0.0
1996 8773 0.0 0.0 0.0
1997 8338 0.0 0.0 0.0
1998 7494 0.0 0.0 0.0
1999 7130 0.0 0.0 0.0

For data sources see[5]

References