X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885083312000

Well Details

Well ID: 0885083312000
Loading map...
Location: 00/12-33-088-08W5/0
Location Alias: 00/12-33-88-08 W5M
Location Alias 2: 00/12-33-088-08 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 08
Section: 33
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 12-33-88-8
Operator Name: Surge Energy Inc.
License Number: 0234470
License Date: 2000-02-29
License Status: Amended
Spud Date: 2000-03-12
Final Drill Date: 2000-03-28
Well Total Depth: 1312.00 m
Surface Hole Latitude: 56.678607
Surface Hole Longitude: -115.221242

For data sources see[1][2]

Well History

Date Event
2000-02-29 Obtained License
2000-03-12 Conductor Casing Operation Performed
2000-03-16 Surface Casing Operation Performed
2000-03-19 Lost Circulation Occurred
2000-03-20 Direction Drilling Operation Performed - Deviate
2000-03-24 Intermediate Casing Operation Performed
2000-03-28 Finished Drilling
2000-03-28 Well Log Performed
2000-03-29 Liner Casing Operation Performed
2000-03-29 Well Log Performed
2000-03-30 Rig Released
2000-03-30 Well Mode changed to Drilled and Cased
2000-04-10 Perforation Treatment Performed - Jet Perforation
2000-04-13 Perforation Treatment Performed - Remedial Casing
2000-04-17 Perforation Treatment Performed - Jet Perforation
2000-04-18 Perforation Treatment Performed - Jet Perforation
2000-04-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-05-04 Well Began Production
2000-05-04 Well Fluid changed to Crude Oil
2000-05-04 Well Mode changed to Pumping
2005-12-02 Well Fluid changed to Crude Oil
2005-12-02 Well Mode changed to Suspended
2005-12-04 Well Fluid changed to Crude Oil
2005-12-04 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-03-20 745.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-04-10 Perforation 383.00 383.30 72
2000-04-13 Remedial Casing Cementing 383.00 383.30 0
2000-04-17 Perforation 1284.80 1291.00 20
2000-04-17 Perforation 1269.50 1272.60 20
2000-04-18 Perforation 1274.20 1276.60 20
2000-04-18 Perforation 1261.40 1265.70 20
2000-04-20 Acid Treatment 1284.80 1291.00 0
2000-04-20 Acid Treatment 1261.40 1276.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 5336 0.0 0.0 0.0
2001 8617 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8255 0.0 0.0 0.0
2004 8735 0.0 0.0 0.0
2005 8431 0.0 0.0 0.0
2006 8514 0.0 0.0 0.0
2007 8592 0.0 0.0 0.0
2008 8656 0.0 0.0 0.0
2009 8669 0.0 0.0 0.0
2010 8576 0.0 0.0 0.0
2011 8218 0.0 0.0 0.0
2012 8721 0.0 0.0 0.0
2013 8720 0.0 0.0 0.0
2014 8483 0.0 0.0 0.0
2015 8275 0.0 0.0 0.0
2016 8566 0.0 0.0 0.0
2017 8673 0.0 0.0 0.0
2018 8721 0.0 0.0 0.0
2019 8690 0.0 0.0 0.0
2020 2048 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2000-03-19 Lost Circulation 638.00 1130.00

For data sources see[7]

References